Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Seeking feedback for denied credit

NC-2009 EAc1:Optimize Energy Performance
posted by  Brian Harris  on 

Please see below for comments from USGBC relative to our design submittal for Portland Fire & Rescue Station 21 (1000020729). We've sent inquires to USGBC several times with no response.

1
Wed Sep 17, 2014, 1:59 pm

Seeking feedback for denied credit

NC-2009 WEc3:Water Use Reduction
posted by  Brian Harris  on 

Please see below for comments from USGBC relative to our design submittal for Portland Fire & Rescue Station 21 (1000020729). We've sent inquires to USGBC several times with no response.

1
Tue Sep 16, 2014, 6:27 pm

IEQc4.1- Low emitting materials- adhesives and sealants req.

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Stephanie Santiago  on 

For the Low emitting materials- adhesives & sealants, there are 3 adhesives that are between 195 and 320 g/l over the VOC limit. I am using the Special purpose contact adhesive limit.

1
Tue Sep 16, 2014, 6:12 pm

Permanent building - envelope construction

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Jeannie Rueter  on 

We have a client that wants to reduce costs for a warehouse by using a tensioned fabric structure rather than a metal building. My first thought is that it might be considered impermanent.

1
Tue Oct 7, 2014, 1:47 am

Duct Insulation Adhesive

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  R G  on 

Hi, we used a adhesive for duct insulation. I am trying to find the 'product type' for this Non-Flooring Adhesives & Sealants from the drop down menu options listed in leed online template.

1
Tue Sep 16, 2014, 10:46 pm

Changing RP credits?

CI-2009 RPc1:Regional Priority
posted by  Katie Peterschmidt  on 

Has anyone else found that when looking up RP credits for a particular zip code, that they have mysteriously changed from when you had previously looked them up for that same zip code and same rati

1
Wed Sep 24, 2014, 8:35 pm

Ecological Species Consultation in California Coastal Zone

ND-Plan-v4 SLLp2:Imperiled species and ecological communities
posted by  Robyn Vettraino  on 

Does anyone have feedback on the applicability of the listed consults required for this Credit vs.

0

Parking spaces for transients only

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Noriko Nagazumi  on 

Our project is located central area of metropolitan city. The facility is university campus building.

0

what is the exact definition of footprint

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  ebru unver  on 

hi everyone, we re working on a project in Turkey İstanbul in which we will be applying for this credit. But we re having a hard time on deciding what the building footprint is.

1
Mon Oct 6, 2014, 4:40 pm

MPR #6

CI-2009 PIf1:Minimum Program Requirements
posted by  Tracy Baker  on 

I am working on a CI project that is within a LEED Platinum building. The base building did not install tenant submetering. It does, however share whole building energy use data with the USGBC.

1
Wed Oct 22, 2014, 7:45 pm