ASHRAE 62.1 - 2007 section 5.9 Particulate Matter Removal
NC-2009 IEQp1:Minimum IAQ Performanceposted by Carolina Vergnano on
To comply with the section 5.9, Particulate Matter Removal, the HVAC system needs to have a filter or an air cleaner having a minimum efficiency of MERV 6. Does this filter needs exactly be insid
WEp1 Scope or Space?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Bracewell-Musson on
The Bird's Eye above states only fixtures within the project 'SCOPE' which would mean that a project that does not include plumbing fixtures, would be exempt.
Water Use in a Horizontal Expansion
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Neil Rosen on
What do you do if you are constructing a horizontal expansion but you have no plumbing fixtures in the expansion?
commissioning performance period
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Pablo Fortunato Suarez on
This is for a 1st time EBOM project (not recertification). If Six Sigma Projects were initiated 5 years prior to LEED registration but implemented every year thereafter until the present time: 1)
Authority having Jurisdiction
CS-2009 IEQp1:Minimum IAQ Performanceposted by Diego Prada on
We are working on a CS naturally ventilated office Building.
How to keep birds away from PV panels
Schools-2009 EAc2:On-Site Renewable Energyposted by Gendel Metlitsky on
How to keep birds away from PV panels on the roof - any suggestions?
Lighting Power Density
NC-2009 EAp2:Minimum Energy Performanceposted by Guillermo T. Adamo on
Hi, im working in the design of a petrol station persuing LEED certification.
Condensate meters
EBOM-2009 WEc1:Water Performance Measurementposted by Andrea Marzullo on
1. Is anyone using condensate for make-up to their cooling tower? 2. If so, what size and type of meter is being used? 3.