Forum quick links
Upper and lower roof
Healthcare-v2009 SSc7.2:Heat island effect - roofposted by BABAR MEHMOOD on
There is a small pump room designed on the roof top.
greenfield or previously developed land?
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Adi Negara, LEED AP BD+C on
Can anybody tell me in what category does the paddy (rice) field would fall under?
U-Factor for Vertical Fenestration
NC-2009 EAc1:Optimize energy performanceposted by TOMAS URIBE on
Hello, We are wondering if it is possible to perform a detailed simulation using the LBNL (Lawrence Berkeley National Lab) Windows Software to comply with the Fenestration Assembly U-Factor. Than
Selecting baseline for mixed use building
NC-2009 EAp2:Minimum energy performanceposted by Lavanya Veerappa on
We are working on a project which is mixed use facility (6 storey/G+5) . The first & 2nd floor is used for office & remaining for residential.
EA 5,1
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Muhammad Faisal Azizullah Jaffar on
We are working on a mall project going ahead with the LEED CS GOLD.We are currently on tender stage and the client has suddently come up with the LEED requirement.
Case 2 Calculator - Space Types
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Timothy Casper on
Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices).
Projects outside the U.S.
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Stefanie Hoffmann on
Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t
Projects outside the U.S.
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Stefanie Hoffmann on
Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t
Temporary carpets / rugs
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Maya Karkour on
Hello, Do roll-out carpets / rugs usually used in residential apartments need to be certified?
Planned Transfer Center
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Josh Mauldin on
My project is a fire station that is the first project on the site of a mixed use development. A bus transfer center is planned to be built directly across from the fire station.