Forum quick links
Lost IAQ Photos
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Melissa Wrolstad on
I am working on a project with an IAQ plan that was followed during construction.
Daily Average Building Occupants for WEc3
posted by David Mirabile on
How would you calculate your Daily Average Occupancy (for transients)?
Common services
posted by javier bolanos zeledon on
This is a retrofit of an existing office building within a medium manufacturing company. The office building is about 5000sq ft and the overall facility about 100 000sq ft.
Gravel Coeffecients
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Steve Walker on
I have 3 parking lots which are comprised of gravel (chat)....what would the coefficient for this be? I believe it should be less than any kind of pavement but more than grass.
Equation 1 Interpretation
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Austin Evans on
In the Volume Captured equation the variable "I" is said to stand for percent impervious of surface. Is this the same thing as the coefficients or is this different?
Portfolio Manager for Dormitories
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by JOHN COOK on
We have an 180,000 sf dormitory and trying to get an ENERGY STAR rating through Portfolio Manager.
Typical Design CO2 Level
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Maya Karkour on
Dear all, I understand that LEED doesn't require you to specify a maximum CO2 level for this credit.
Recycling Area - Exterior
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Mark Pappas on
We are working on a retail/office CS project (2.0) and are looking at placing the recycling outside adjacent to the dumpster area, as the interior common areas don't accommodate all tenants very we
IEQ3.2 IAQ MANAGEMENT PLAN - OPTION 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jérôme Aruanno on
Hi, I am questioning about the second option, mesuring the contaminant levels. The table p 462 is indicating level to respect.
EBOM IO 2009 - SS cr 8
EBOM-2009 IOc1:Innovation in Operationsposted by Salvatore Benvenga on
1. SS cr 8 - would the addition of timers and sensors for internal light fixtures in multiple zones qualify as an IO point?