Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Prop 65 Restrictions in IEQ 4 Group 1

LEED for Healthcare forum
posted by  Bruce Maine  on 

Good morning. I'm having trouble geting my arms around the requirement that adhesives and sealants contain not more than 1 percent of chemicals listed in Prop 65.

7
Sustainability and Environment Director
PROSOCO, Inc.
LEEDuser Basic Member
126 thumbs up
Fri Sep 28, 2012, 5:56 pm

Campus Project - With Only one Building to be LEED certified

LEED Guidance for Campuses and Multiple Buildings
posted by  Udana Ratnayake  on 

I'm working on project where there are three buildings (main building and two other support service building) in the same site.

2
Fri Sep 28, 2012, 2:19 pm

"Site energy" usage for a multiple building project

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Chris Miller  on 

A small site has two office buildings, a storage building and parking lot.

6
Technical Customer Service Specialist
GBCI
LEEDuser Premium Member
105 thumbs up
Fri Sep 28, 2012, 1:56 am

SSCr2 - Option 2 LEED Review

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Thomas Boyd  on 

Just received comments back from GBCI regarding our SS credit 2.

8
Associate Director
Atelier Ten
LEEDuser Basic Member
169 thumbs up
Thu Sep 27, 2012, 10:23 pm

Comparison EU energy rating vs Energy Star

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Maria Porter  on 

Please, has anyone done the comparison between Energy Star and the European energy rating system for appliances? Can you share it?

2
Thu Sep 27, 2012, 10:59 am

EAc 5.1 for CS tenant spaces

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  charles bell  on 

Our current design has a Quadlogic multi-tenant smart meter unit in the basement of our mid-rise project. This unit has the capacity for electrical power as well as BTU monitoring.

3
Default Avatar
principal
theGreenTeam, Inc.
LEEDuser Basic Member
10 thumbs up
Wed Sep 26, 2012, 8:22 pm

High cost of energy improvements

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Paulo Pinheiro  on 

Our building don´t have a good energy efficiency, the commissioning process indicate many ways to obtain a good energy efficiency, we are doing first the low cost way and after the high cost way, b

6
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Wed Sep 26, 2012, 2:21 pm

LPD and EA credit 1

CS-2009 EAc1:Optimize Energy Performance
posted by  Alex AC  on 

I hope everybody is having a great day! I came across this thread and a bunch of questions popped into my head.

5
Default Avatar
LEEDuser Basic Member
5 thumbs up
Tue Sep 25, 2012, 7:34 pm

HVAC System Baseline modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Henrique Mendes  on 

I´m not sure if we have modeled the HVAC baseline system correctly. We are in a climate zone 2a (São Paulo - Brazil).

3
Mr.
Green Domus | Desenvolvimento Sustentável
LEEDuser Basic Member
13 thumbs up
Tue Sep 25, 2012, 6:29 pm

90% minimum purchase compliance during performance period

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Julio Sanchez  on 

Guys, I have this problem, we have buildings that were recently retrofitted to T8 bulbs but also have several pin based CFL fixtures in our buildings, we are in our second performance period now an

4
Sustainability Professional
LEEDuser Expert
430 thumbs up
Tue Sep 25, 2012, 3:43 pm