Forum quick links
custom-made refrigerator for EBOM project
NC-2009 EAp3:Fundamental refrigerant managementposted by Jorng-ren Chern on
I am working on EBOM for an old office building which includes an employee cafeteria.
1 Additional Bonus Point for earning all 4 RPCs
CI-2009 RPc1:Regional priorityposted by Nandana Kumar on
Hi, I wanted to understand if it is possible to earn 1 additional bonus points, if the project has earned all 4 points under the RPCs. or is the interpretation of earning only a maximum 4 RPCs
School Campus Registration
posted by Ameet AA on
Hi I am working on a School Academy using the NC2009 for School & 2010 AGMBC guidelines. The campus consists of 5 main buildings and 1 FM building and1 Energy centre.
scope of materials
CI-2009 MRc3.2:Materials reuse - furniture and furnishingsposted by Adam Targowski on
I would like to clarify what should be included in the calculations for this credit.
LUSTs discovered and remediated
CS-2009 SSc3:Brownfield redevelopmentposted by charles bell on
Project is urban core multi-story mixed use CS. Leaking Underground Storage was discovered and remediated (including soil) and identification of water wells in the vicinity.
Requirement for CO2 sensor and OA measurement device
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Barbara McCrary on
I found a thread from 2011 discussing the Addendas released 5/9/11 removing the footnote that was previously changed under Addenda reliease 9/19/10.
Best Timing for ASHRAE Audit?
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Nelina Loiselle on
What is the best timing for the ASHRAE Level I walkthrough audit? We have our energy star label already, are working on getting our tracking in place for the other credits.
Core Fixtures Existing, Tenant to Install Additional Fixtures
CI-2009 WEc1:Water use reductionposted by Nelina Loiselle on
I have a LEED-CI project in which there is one toilet that is EXISTING in the base building and NOT A PART OF THE SCOPE of the tenant improvement.
Motorcycles parking space
EBOM-2009 SSc7.1:Heat island effect - nonroofposted by Rosana Correa on
In our project, some of the parking spaces are specific to motorcycles, with smaller areas than in car's spaces.
Category for IEQ Credit 4.1
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by S D on
I am new to the LEED process. I am having trouble determining which categories the following products fall under for the purpose of IEQ Credit 4.1.