Topic | Recent |
---|---|
Existing Building HVAC being upgraded and will serve new addition- LPB?NC-v4 MPR2: Must use reasonable LEED boundariesposted by Sue Bryant on Jun 20, 2018, 11:11 am
WE have a project that is an addition to an existing building. The addition is served by the HVAC from the existing building. It is my understanding that per the following, the addition could be... Last reply: Tristan Roberts, Oct 15, 2018, 3:46 pm |
|
Is underground Parking included in Certification fees calculations?NC-v4 MPR2: Must use reasonable LEED boundariesposted by Amine Zeidane on Sep 18, 2018, 11:42 amDeborah Lucking Director of Sustainability Fentress Architects LEEDuser Expert 258 thumbs up September 19, 2018- 11:36 am From a discussion we had in 2016: https://leeduser.buildinggreen.com/forum/loading-dock-and-parking-be-counted-gross-floor-area "In ASHRAE-90.1, the definitions of the various types of enclosed “space” to be included in the gross floor area include the note, “Crawlspaces, attics, and parking garages with natural or mechanical ventilation are not considered enclosed spaces.” Typically garages are deemed "unoccupied" and excluded from LEED GFA for fees. Log in or register to post comments ... Last reply: Deborah Lucking, Sep 19, 2018, 11:36 am |
|
New V4 Project Boundary Overlaps Existing V2009 Project BoundaryNC-v4 MPR2: Must use reasonable LEED boundariesposted by Doug Shilo on Nov 14, 2017, 1:44 pm
An existing V2009 Project is getting an expansion that will fall under V4. These will be separate structures connected on each floor, and the expansion falls right in the existing project's LEED... Last reply: maria esther lamadrid, Jul 27, 2018, 11:17 am |
|
LEED Project boundaryNC-v4 MPR2: Must use reasonable LEED boundariesposted by Neetika Parmar on Feb 9, 2017, 12:05 am
Our Project is an Office cum warehouse. The area distribution is: Office- air conditioned with an area of 4 000 sq.ft (G+1) Last reply: Nadav Malin, Jun 12, 2018, 1:37 pm |
|
Excluding adjacent park from LEED BoundaryNC-v4 MPR2: Must use reasonable LEED boundariesposted by Chad Thurlow on May 30, 2018, 11:43 am
Hello I dealing with a project where an adjacent park mostly made of turf grass is being installed beside the building going for certification. Both the building and the park are owned by... |
|
Building Add-on to Design-Build Parking StructureNC-v4 MPR2: Must use reasonable LEED boundariesposted by GBD Architects on Dec 19, 2017, 1:34 pm
We are pursuing an office project that would be essentially an addition to a parking... Last reply: Summer Minchew, Jan 4, 2018, 12:13 pm |
|
Small addition to existing buildingNC-v4 MPR2: Must use reasonable LEED boundariesposted by Edmée Knight on Dec 11, 2017, 5:53 pm
Our project is a small addition (<10% of total building GSF) to an existing building. The new addition will be tied to the existing buildings HVAC system and will consist of a lobby and some... Last reply: Tristan Roberts, Dec 12, 2017, 5:19 pm |
|
new building on site with existing buildings- LEED boundary?NC-v4 MPR2: Must use reasonable LEED boundariesposted by Courtney Royal on Feb 27, 2017, 1:18 pm
Our project is a new construction building and will be constructed on a site that already has 2 other structures. One of the structures is a retail space, that some of the employees from the new... Last reply: Tristan Roberts, Jul 7, 2017, 4:36 pm |
|
Single certification for physically distinct structuresNC-v4 MPR2: Must use reasonable LEED boundariesposted by NAMRATA GUPTA on May 21, 2017, 7:34 am
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc. None of the buildings have an area of more than 25,000 square... Last reply: Tristan Roberts, Jul 7, 2017, 4:17 pm |
|
LEED Certification for a portion of a buildingNC-v4 MPR2: Must use reasonable LEED boundariesposted by Eesmyal Santos-Brault on Jun 21, 2017, 5:41 pm
Hi there, Last reply: Charalampos Giannikopoulos, Jun 22, 2017, 6:02 am |