Water metering Strategy Narrative
NC-v4 WEc4:Water meteringposted by marty seese on
Leed online indicates that the documentation needed is a water metering strategy narative. Is this like written text or do drawings work? Just wanting to provide the correct information.
Building Flush-Out Inquiry
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Bolaji Olanrewaju on
I am currently working on a LEEDv4.1 NC Office project that is looking to conduct a flush-out pre-occupancy. Would we need to perform the flush-out duration per each zone (e.g.
USGBC points Table for CalGreen projects for LEED v4 BD+C: NC
posted by Saurabh Shrestha on
Hi,
WEpc115 Rainwater capture
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Aliesa Adelman on
Our project takes into account a rainwater harvesting system as part of the conservation strategy. I'm interested in hearing from others who have utilized capture and/or other innovative stra
Terrace Planters
CS-v4.1 SSc2:Protect or Restore Habitatposted by Bret Mantyk on
I'm wondering if terrace plantes are totally out of scope for Protect or Restore Habitat or if there are certain specifications that would allow for terrace planters to count towards the credit.
Greenhouse - Regularly Occupied?
NC-v4 EQc5:Thermal comfortposted by Irene Chung on
I am working on a new university building project pursuing LEED v4 BD+C New Construction, and it includes a greenhouse.
Irrigation for a Greenhouse?
NC-v4 WEp1:Outdoor water use reductionposted by Irene Chung on
Does irrigation water use for plants in the greenhouse need to be included in the credit calculation?
Greenhouse
NC-v4 SSc6:Light pollution reductionposted by Irene Chung on
Does a greenhouse need to be included in the light pollution calculations? (e.g., the vertical illuminances and the percentage of total lumens emitted above horizontal)
Default Gravel SRI Values
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Annalise Reichert on
I am also working on a project that has a large green roof with light colored gravel in some areas. The manufacturer has not performed testing to provide an SRI value for the gravel.
LEED boundary - disturbed land that will support more than the project
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Kimberly Reddin on
Hi,