Do school buses contribute to the Option 2 rate

Schools-EBOM-v4 LTc1:Alternative transportation
posted by  R. Ted Krasnesky  on 

Do school buses contribute as a "ride share" option for students that contribute to the Option 2 alternative transportation rate?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Fri May 23, 2014, 3:54 pm

UNDERLAY underneath carpet tiles

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  jack larson  on 

acceptable entryway systems include permanently installed grates, grills, and slotted systems that allow for cleaning underneath.

3
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 23, 2014, 2:57 pm

Certified LEED CI project going for EBOM

EBOM-2009 SSc1:LEED Certified Design and Construction
posted by  Michelle Raigosa  on 

Has anyone with a previously certified LEED CI Silver project (that occupies an entire building with a triple net lease) earn SS Credit 1 under the EBOM rating system (since it was not certified un

3
President
Design Management Services
LEEDuser Premium Member
25 thumbs up
Thu May 22, 2014, 4:15 pm

location of charging stations

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Sahar Abi-Ziki  on 

We are installing 12 charging stations in the project, and we are wondering where is the preferential spot to install them. 4 will be installed outside to accommodate visitors and the rest inside.

3
Thu May 22, 2014, 4:00 pm

Water category questions

General forums
posted by  Maria Porter  on 

Hi Tristan! I dug deeper into the water category yesterday and a few questions surfaced: •Water Metering credit – At least two out of six systems have to be sub metered as applicable to the projec

4
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Thu May 22, 2014, 12:51 pm

SSc7.2 Heat Island Effect, Roof

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Francisco Villela  on 

LEED 2009. NC: I am using the LPE option for SSc7.2. Is it normal for the form NOT to indicate points documented at the bottom when completing the form using the LPE option?

6
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Wed May 21, 2014, 3:31 pm

LEED CS & CI built at the same time.

CI-2009 IDc1:Innovation in Design
posted by  Emmanuel Gee  on 

Hello, We have a project where the CS and one CI tenant is being built at the same time.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed May 21, 2014, 3:07 pm
8
Architect
Buro Happold
LEEDuser Basic Member
55 thumbs up
Wed May 21, 2014, 3:50 am

DOOR ADEHSIVE

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  jack larson  on 

I have a special synthetic resin adhesive developed for flush door construction.

3
Tue May 20, 2014, 9:41 pm

Checks for Design Preliminary Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

We are about to submit our first "Design Preliminary Review" for our LEED Gold project. All design credit templates have been filled out and signed.

2
Sustainability Professional
Bright Green
LEEDuser Basic Member
31 thumbs up
Tue May 20, 2014, 6:50 pm