Topic | Recent |
---|---|
LEED CS 2009 EAc1CS-2009 EAc1: Optimize Energy Performanceposted by Ruel Galve on Aug 24, 2015, 5:11 am
We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design... Last reply: Ruel Galve, Aug 25, 2015, 10:04 pm |
|
Pressure drop adjustment factor with DOAS SystemCS-2009 EAc1: Optimize Energy Performanceposted by Curtis Clark on Apr 8, 2015, 4:21 pm
In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system. In the baseline model, we have... Last reply: Marcus Sheffer, Apr 9, 2015, 10:51 am |
|
This just... USGBC changes to CS energy modeling requirementsCS-2009 EAc1: Optimize Energy Performanceposted by Seema Pandya on Apr 29, 2010, 4:03 pm
From the USGBC: Be aware of the following update to the submittal documentation for LEED-CS v2.0 EAc1. As a result of... Last reply: Marcus Sheffer, Mar 26, 2015, 11:25 am |
|
EA Credit 1 ACP (Alternative Compliance Path)CS-2009 EAc1: Optimize Energy Performanceposted by Harry Flamm on Feb 13, 2015, 1:38 pm
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP? I see the form in the LEED online but cannot locate any... Last reply: Marcus Sheffer, Feb 13, 2015, 8:20 pm |
|
Simulation software and Ashrae 90.1 versionCS-2009 EAc1: Optimize Energy Performanceposted by Antonio Márquez on Feb 12, 2015, 2:30 am
Hi, we are certifying a new C&S building, in v2009. The version of Ashrae 90.1 to follow is 2007? Or do we have to change to 2010? Also, do you know if Trnsys is an... Last reply: Marcus Sheffer, Feb 12, 2015, 10:44 am |
|
Cold C&S- No HVACCS-2009 EAc1: Optimize Energy Performanceposted by Scott Johnson on Jan 13, 2015, 3:22 pm
We have a project that consists of a cold core and shell that will have warm lobby. The remainder of the building will be unconditioned and the actual tenant or building use (lab, office, etc)... Last reply: Marcus Sheffer, Jan 17, 2015, 2:34 pm |
|
Different HVAC system in baseline than proposed design- C&SCS-2009 EAc1: Optimize Energy Performanceposted by Ron Dean on Oct 7, 2014, 10:53 am
I am doing the energy model for a CS project. The baseline HVAC is a packaged rooftop (direct expansion) and the proposed design includes chillers and piping to each tenant space, but it doesn't... Last reply: Marcus Sheffer, Oct 7, 2014, 11:20 am |
|
HVAC Systems Selection for BaselineCS-2009 EAc1: Optimize Energy Performanceposted by Mark Stromberg on Jun 19, 2014, 7:52 pm
My question is regarding the following procedure as outlined in Trace 700 help: "To determine which ASHRAE baseline system to model, refer to ASHRAE Standard 90.1-2007, Table G3.1.1A (... Last reply: Marcus Sheffer, Jul 8, 2014, 9:39 pm |
|
TABLE 6.5.3.1.1B Fan Power Limitation Pressure Drop AdjustmentCS-2009 EAc1: Optimize Energy Performanceposted by Mark Stromberg on Jun 25, 2014, 2:50 pm
I would like some help on the intent and definition with some examples that can use 0.5 in. w.c. as credit for: "Return and/or exhaust airflow control devices". Thanks Last reply: Mark Stromberg, Jun 27, 2014, 5:39 pm |
|
Thermal Blocks- HVAC Zones Not DesignedCS-2009 EAc1: Optimize Energy Performanceposted by MKK LEED on Jun 17, 2014, 12:38 pm
We are modeling a new construction mall, and I would like to get another perspective on how to approach the zoning. The project will be applying for certification under LEED 2009 Core and Shell.... Last reply: Marcus Sheffer, Jun 20, 2014, 12:46 pm |