Forum quick links
Do non-contiguous habitat areas qualify?
NC-v4.1 SSc2:Protect or Restore Habitatposted by Jennifer Rennick on
We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible.
Interested in setting 'best practices' and permit/review template for embodied carbon? (LCA/WBLCA)?
posted by Barbra BatShalom on
Greetings!
Back again re: the work we're doing with City of Cambridge, in their great leadership efforts to develop EC policy/regs/incentives and reporting requirements.
Lights mounted under a photovoltaic canopy
CS-v4 SSc6:Light pollution reductionposted by Samuel Calhoun on
Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?
INpc142 Safety First Pilot Credit Arc Re-Entry
EBOM-v4.1 INc1:Innovationposted by Barry Abramson on
Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented for
INpc139 Safety First Pilot Credit - Building Water System Recommissioning
EBOM-v4.1 INc1:Innovationposted by Barry Abramson on
We have pursued INpc139 for several projects, and it has spurred buildings to initiate or refresh their Water Management Plans in light of experience through the pandemic.
Close-out of INpc156 - Safety First: Maintenance of HVAC systems during COVID-19
Pilot-Credits INpc156:Safety First: Maintenance of HVAC systems during COVID-19posted by Barry Abramson on
We pursued this credit for several projects in 2021/2022. It was useful to ensure adequate HVAC maintenance was sustained through the pandemic, but at this point it should be standard practice.
No issues
Pilot-Credits EApc111:Alternative Performance Rating Methodposted by Maureen Mahle on
I haven't found any major issue for this credit.
LEED Timeline / Schedule
posted by on
Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project?
Thanks