Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

can i take a credit for on site renewable energy for green power

Performing LEED Green Power Calculations
posted by  Christopher McArdle  on 
I have PV panels on my project building. Can i deduct the annual energy produced from the pv panels when calculating the amount of Green Power to purchase?
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Jul 7, 2012, 6:53 am
9
Sat Jul 7, 2012, 6:48 am

MRc4.2 Copper Piping Joints

LEED for Healthcare forum
posted by  Simon Sue  on 

Per the LEED reference guide and LEEDonline signatory, copper piping joints can only be one of the following: - mechanically crimped - soldered in compliance to ASTM B828 with flux in compliance to

5
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Fri Jul 6, 2012, 8:39 pm
3
Director of Environmental and Engineering Services
Eggers Division - VT Industries
LEEDuser Basic Member
28 thumbs up
Fri Jul 6, 2012, 3:30 pm

Door proximity

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Elizabeth Crenshaw Hammitt   on 

Is it an issue if the door to the smoking room is under 25 feet away from a door that leads to a porch area?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 1:52 pm

Polycyclic aromatic hydrocarbons, PAH

NC-2009 SSc3:Brownfield Redevelopment
posted by  Tanja Arnesson  on 

Hi, My project just got back our Design 2 review, just after we sent in the design credits for the second review the project found old telephone poles within the ground at our project.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Fri Jul 6, 2012, 6:52 am

FTE in a dormitory

Calculating FTEs
posted by  Ashlee Paar  on 

we received feedback on a recent project that asks us to "distinguish between occupants and residents".

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 6:21 am

Adjustable valve for WC fixtures

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maya Karkour  on 

Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly.

2
Default Avatar
Blackney Hayes Architects
LEEDuser Basic Member
0 thumbs up
Fri Jul 6, 2012, 2:08 am

Compliance through natural ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Udana Ratnayake  on 

We have a canteen area in one of our projects that is to be naturally ventilated through open windows and ceiling fans.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 1:08 am

IEQc2 - Why haven't we been awarded the credit?

NC-2009 IEQc2:Increased Ventilation
posted by  Mairead Morrissey  on 

Hi, We have an overall 30% ventilation above ASHRAE, for each individual space.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Jul 6, 2012, 12:59 am