Forum quick links
Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces
NC-v4 EAp2:Minimum energy performanceposted by Mini Laird on
We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.
Baseline Required Outdoor Airflow for Toilets
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Forum Users!
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
System fan power - Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the system fan power calculation described in section G.1.2.9.
ASHRAE 90.1 Section 6.5.3
NC-v4 EAp2:Minimum energy performanceposted by Michael Abramson on
Good afternoon all,
Process or non-process? Kitchen Hood Exhaust and Makeup Air
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I thought I recalled reading that the HVAC energy related to a commercial kitchen hood was considered Process Energy.
Parking area to be included for EUI consideration
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
Hi,
Glare control strategy UGR < 19 or UGR =< 19?
NC-v4.1 EQc6:Interior Lightingposted by Yara Ibrahim on
The EQ Credit Interior Lighting specifies for the ‘Glare Control’ strategy to “achieve a Unified Glare Rating (UGR) rating of <19 using software modelling calculations of the designed lighting”.
Any success with this credit yet?
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Sophie Kerr on
Hello,
I've submitted for this pilot credit but haven't received reviewer comments yet, has anyone received comments, what are they?
Sophie