Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

RECs in EBOM 4.1

EBOM-v4.1 EAp3:Energy Performance
posted by  Christian Garcia  on 

I came across an old video where it is explained this version doesn't take into account the purchase of RECs but it is considered for the future. This video is from 5 years ago.

1
Tue Jul 16, 2024, 5:27 pm

High Priority Site - Priority Destination for projects outside U.S.

CS-v4 LTc3:High priority site
posted by  Sajna Cherur Nathankoden  on 

Hi, 
What are the examples for Priority Destination for projects outside U.S.?

1
Fri Apr 19, 2024, 1:45 pm

Does a "Hot Zone" in a Fire Station need individual door closers?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adrienne Franz  on 

Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus bay, decontamination room, a restroom, tool storage, lawn storage, turnout gear lockers, a janito

0

REACH and Global Green Tag certification count for the Optimization

NC-v4.1 MRc4:Material Ingredients
posted by  Summer Gorder  on 

Can REACH and Global Green Tag certifications count for the Optimization even if they aren't international projects?

 

1
Thu Apr 18, 2024, 12:29 pm

Process Water and Arc

EBOM-v4.1 WEc1:Water Performance
posted by  Jenni Betancourt  on 

I've been trying to communicate with Arc with no luch. We have Arc Essentials which supossedly could help us determining our potential score.

1
Thu Apr 18, 2024, 6:31 am

Would a fire sprinkler system count as "other process water"

NC-v4 WEc4:Water metering
posted by  Cindy Quinn  on 

Has anyone had success with a fire sprinkler system being one of the subsystems?  Would it count as "other process water"?

TIA!

1
Wed Apr 17, 2024, 6:46 am

Waste management plan submission with multiple GC's

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Blake Weaver  on 

I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different GC.

2
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
250 thumbs up
Tue Jan 13, 2026, 10:38 am

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 in

0

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 includ

0