Forum quick links
LEED v4.1 Energy Cost Budget Method - Clarifications
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amal Venugopal on
Hi All,
Greetings!
Hope you all are safe.
Simulation Model upload
NC-v4 EAp2:Minimum energy performanceposted by R.L. Bowen on
Hi! We recently uploaded a project for review. Unfortunately we missed uploading the actual energy model.
Entryway mats stairs / staircase
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Maya Karkour on
Our project has a staircase in front of the entrance. The clearance between the entrance and the stairs is less than 3 meters (about 1 meter).
Existing hill plant
EBOM-v4 SSc1:Site development - protect or restore habitatposted by Omar Elrawy on
We have an area in our existing project's boundry that has few vegetated area, but the whole area was not touched by the owner or by anyone before.
Non-continuous floors
CI-v4 MPR2:Must use reasonable LEED boundariesposted by David Edenburn on
I have seen this question asked but not answered. We have a client who will renovate three floors of an office building; typical CI project. The issue is that they will do floors 7, 17, 18.
Visitor Count for Data Centers
Data-Centers-NC-v4 LTc6:Bicycle facilitiesposted by Bethany Beers on
Does anyone have any guidance for calculating visitors for a private, secure data center?
Waste generated by furniture installation?
NC-v4 MRp2:Construction and demolition waste management planningposted by Renee Shirey on
Although installation of furniture is now required before any Indoor Air Quality Assessment can be done, the scope of furnishings are often dealt with separately, in separate contracts. Becau
Legal Sources and Responsible Sources
Pilot-Credits MRpc102:Legal Woodposted by on
I'm trying to pursue this Pilot Credit and see that it has to be wood from legal source (100%) and Responsible Sources (70%).
Labs ramping up for v4.1?
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Erica Downs on
I'm hearing from a potential EHS contractor that the testing labs are having a hard time ramping up to meet the testing requirements of v4.1, and the testing is going to be quite expensive. I