Forum quick links
Equipments to be commissioned
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Alvaro Valdivia on
Hi: I have a boubt about the water heating equipment to be commissioned.
Information: Regional Priority Credit on International Projects?
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Raymond Loo on
My understanding is that an extra Regional Priority Credit can be earned on international projects here. Does anyone have any details to the actions required to get this RPC point?
Exempt compounds
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Paola Figueiredo, Newton Figueiredo on
The LEED´s definition of VOC should not be exclude the exempt compounds from the VOC content. However, according to the SCAQMD rules 1113 and 1168, the exempt compounds must be calculated.
Interior concrete stain
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Chris Sanders on
Does interior concrete floor stain fall into the Floor Coatings category, with 100 g/L VOC?
0% Open Space Requirements
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Nándor Kovács on
I'm working on a project located in high density urban area which means 100% of the site can be built in the ground floor. How do i have to calculate 25% in this case?
Steel structure enamel
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by javier bolanos zeledon on
Hi, this is a retrofit of an existing building where all the exterior structural walls are being replaced and also the interior walls.
SSc4 EBOM v2.2
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Sheryl Swartzle on
Our project is 750,000 sf office with 1277 occupants. Project is located in Miami and has it's own parking garage.
Calculating material costs in MRc4 and MRc5
NC-2009 MRc4:Recycled Contentposted by Alexander Aaltonen on
I have similar concerns as Maria described earlier, and I would really appreciate some advice on how to calculate material costs in a case where a sub-contractor is performing concrete works on-sit
Greenhouse
Schools-2009 EAc1:Optimize Energy Performanceposted by Lisa Logan on
Client is adding greenhouse to the school project - sort of late in the game. Does this space get included in our energy calcs? I am assuming yes and that there is no way around it.
Signage Details?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Marketing Coordinator on
Hi, I'm working on a LEED 2009 for Schools project and just rec'd my Design review comments.