Forum quick links
Lavatory Faucet default duration change during construcion.
NC-2009 WEc3:Water Use Reductionposted by BH . on
Hi, Due to "Water use reduction Additional Guidance" from July 14,2011 Nonresidential Default Lvatory Faucet duration has changed from 15 to 30 sec.
new project with old HVAC
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Timo Marquez on
I would like to know if the following complies with EAp3: We have a new construction (in process 2011) and the owner is purchasing an old HVAC systems that used R-12.
Fenced playgrounds
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Daniel McDonald on
We are working on an urban school renovation (SSc2=yes), and I am wondering if having the playgrounds and other outdoor areas behind fences affects this credit at all - are they still "pedestrian o
LEED project defined boundary 1.5 buildings
CI-2009 EAc3:Measurement and Verificationposted by Steve Khouw on
Just to be sure, to be sure, not trying to be picky here. Our new LEED-CI project encompasses 2 buildings, but only 1 is going to be fully occupied and the other only partially,
Combine Option 1 and Option 2?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Julie Hendricks on
Have any of you LEED experts out there ever done a combination of preferred parking spaces and alternative-fuel fueling stations?
All Furniture to be Given to Another Company for Same Use.
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Raymond Loo on
Instead of reusing all of its furniture (chairs, cabinets, cubicle walls, etc.) after the renovation, our client is giving all of it to another company that will use it as furniture. Would this qu
What are reviewers looking for in the section views
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Jean Marais on
I have provided plan views where it is assumed that one can't see over the shown case work, etc. I have provided elevations where one can see the height and size of windows.
IEQp1 Corridor
NC-2009 IEQp1:Minimum IAQ Performanceposted by Carolina Vergnano on
Hello, I'm working on a project that the air exchange in the corridor is made by an adjacent open plan office.
Confirmation of Case 1 Option 2 and Documentation
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Raymond Loo on
To qualify for the 2 credit point here, we would only need to prove that there has been no parking provided or subsidized parking provided to our client (tenant)?
PVmodules for generate of onsite renewable energy and REC
NC-2009 EAc2:On-Site Renewable Energyposted by Florian Schmidtchen on
For a NC manufacturing project we have been aproached by a company who would mount pv-modules on the building roof and sell them to building owner at no cost premium.