Forum quick links
Central daylight control applicable?
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Marco Abdallah on
Hello, there are also systems on the market which measure the daylight amount at a central weather station on the roof of the building and then calculate the shadow and control each lamp with a sof
Food Waste Diversion
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Alexa Stone on
Hi All, I was surprised not to find this in a previous post but I'm glad im bringing it up as it is getting to be a popular item.
COLD FLUID-APPLIED WATERPROOFING RUBBER MEMBRANE
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Ibrahim El-Shair on
What is the VOC limit for COLD FLUID-APPLIED WATERPROOFING RUBBER MEMBRANE which is used under ceramic or in kitchen/bathrooms??
Cork Bulletin Boards and Marker Boards
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Abena Darden on
Does anyone know if cork bulletin boards or marker boards typically have urea formaldehyde resins?
Achieving IEQc1 with no ventilation as part of C&S project
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Tony Schafer on
Can this credit be achieved if there will be no ventilation as part of the C&S project?
Relocating Furniture
CI-2009 MRc5:Regional Materialsposted by Sheela I on
Hello, I am working on a LEED CI project and we are reusing most of the furniture at the new office location. The distance between new and the previous office is with in 500 miles.
Negative Pressure Differential Requirement
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Dear all, One of the credit requirements is that: "The pressure differential with the surrounding spaces must be at least 5 Pa on average and 1 Pa at a minimum when the doors to the rooms are clos
Does a crisis center require covered storage for bikes?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Megan Dougherty on
Our project is a crisis center which provides drop-in services and short term residential services. The drop in portion is considered an institutional project.
Site disturbance from a project surrounded on all four sides
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Achelles DSouza on
I am working on a project which is surrounded by existing facilities on three sides, and road on the fourth side.
Views and window coverings
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Nancy Goshow on
Can you still achieve the views credit if you have a commercial interiors space meeting all of the requirements of the credit except that due to security purposes the horizontal blinds need to be