Forum quick links
Path 4-Heat Island effect non roof
CI-2009 SSc1:Site Selectionposted by Lavanya Veerappa on
Hi, one of my project building (P1) going for LEED CI is located in campus. This building is attached to another building (P2) and even shares a common wall of P1.
separate the office building from the manufacturing area?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Reid Middlebrooks on
The project is a 3 story office building with interior fit out and 3 level garage.
LEED-CI WEp1 & WEc1
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Patti Gunderson on
We happen to have received comments back from two different LEED-CI projects within a week of each other and they appear to include contrary interpretations on the issue of whether or not to includ
LEEDuser SSc4 survey templates updated
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Tristan Roberts on
LEEDuser members -- we have updated the survey templates we offer in our documentation toolkit to take into account the recent review comments we've been seeing asking that teams record the number
LEED Online/Adobe Forms for Pilot Credits
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Melissa Wackerle on
Has the USGBC/GBCI developed LEED Online forms for these pilot credits? I didn't find any in the Pilot Credit Resources page on USGBC's website.
Seam Adhesive for Vinyl Sheet Flooring
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anders Olson on
I am wondering how to categorize a seam adhesive product for vinyl sheet flooring -- specifically, Armstrong S-761.
Annual Energy Cost Escalation
Schools-2009 EAc2:On-Site Renewable Energyposted by Michael Trzcinski on
If a project includes a 3rd party PV system, and the electric rate increases each year after the 1st year (under the PPA), what rate must we use in calculating the dollar savings?
Multiple buildings simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, We are working on a project that has been registered as one single project (NC 2009), but it actually corresponds to three buildings, one is a laboratory, another a distribution storage and
Polished Concrete
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Brynn Horley on
I have had contractors submit an argument that acetone is exempt from IEQ considerations. Is that true?
LEED CI project in China
CI-2009 EAp2:Minimum Energy Performanceposted by Diana Hill on
Hello, We are doing a LEED CI project in China. This is a office building with two 16-floors buildings A, B and a 9-floors building C, which are connected by a 7-floors podium.