Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Path 4-Heat Island effect non roof

CI-2009 SSc1:Site Selection
posted by  Lavanya Veerappa  on 

Hi, one of my project building (P1) going for LEED CI is located in campus. This building is attached to another building (P2) and even shares a common wall of P1.

2
Thu Aug 9, 2012, 10:21 am

separate the office building from the manufacturing area?

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Reid Middlebrooks  on 

The project is a 3 story office building with interior fit out and 3 level garage.

4
Wed Aug 8, 2012, 7:48 pm

LEED-CI WEp1 & WEc1

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Patti Gunderson  on 

We happen to have received comments back from two different LEED-CI projects within a week of each other and they appear to include contrary interpretations on the issue of whether or not to includ

3
Wed Aug 8, 2012, 7:46 pm

LEEDuser SSc4 survey templates updated

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Tristan Roberts  on 

LEEDuser members -- we have updated the survey templates we offer in our documentation toolkit to take into account the recent review comments we've been seeing asking that teams record the number

2
Default Avatar
Sustainability Specialist
TLC Engineering Solutions
LEEDuser Premium Member
45 thumbs up
Wed Aug 8, 2012, 4:07 pm

LEED Online/Adobe Forms for Pilot Credits

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Melissa Wackerle  on 

Has the USGBC/GBCI developed LEED Online forms for these pilot credits? I didn't find any in the Pilot Credit Resources page on USGBC's website.

3
Default Avatar
Sustainability Manager
The Beck Group
LEEDuser Basic Member
4 thumbs up
Wed Aug 8, 2012, 3:37 pm

Seam Adhesive for Vinyl Sheet Flooring

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Anders Olson  on 

I am wondering how to categorize a seam adhesive product for vinyl sheet flooring -- specifically, Armstrong S-761.

4
Default Avatar
Project Manager, LEED AP
Baseline Sustainability
LEEDuser Basic Member
25 thumbs up
Wed Aug 8, 2012, 2:51 pm

Annual Energy Cost Escalation

Schools-2009 EAc2:On-Site Renewable Energy
posted by  Michael Trzcinski  on 

If a project includes a 3rd party PV system, and the electric rate increases each year after the 1st year (under the PPA), what rate must we use in calculating the dollar savings?

5
Tue Aug 7, 2012, 7:28 pm

Multiple buildings simulation

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Hello, We are working on a project that has been registered as one single project (NC 2009), but it actually corresponds to three buildings, one is a laboratory, another a distribution storage and

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Aug 7, 2012, 4:42 pm

Polished Concrete

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Brynn Horley  on 

I have had contractors submit an argument that acetone is exempt from IEQ considerations. Is that true?

12
Tue Aug 7, 2012, 3:50 pm

LEED CI project in China

CI-2009 EAp2:Minimum Energy Performance
posted by  Diana Hill  on 

Hello, We are doing a LEED CI project in China. This is a office building with two 16-floors buildings A, B and a 9-floors building C, which are connected by a 7-floors podium.

7
Tue Aug 7, 2012, 12:54 am