Contractor reuse of waste materials on their other projects

NC-2009 MRc2:Construction Waste Management
posted by  John Covello  on 

Hello, Our contractor will most likely reuse some waste materials on their other projects if they have any left over.

3
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Mon May 6, 2013, 1:45 pm

FSC certified subcontractor?

NC-2009 MRc7:Certified Wood
posted by  Erin Holdenried  on 

Does a subcontractor, who is cutting and finishing FSC wood in their own facility and installing it in the project have to be FSC certified?

6
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Sun May 5, 2013, 5:52 pm

Requirements for Hotel Projects

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Shakir Ismail  on 

Hi Everyone, Just to confirm I have this straight: For designated hotel smoking rooms / smoking restaurants / bars / etc.

2
Default Avatar
Project Engineer
BNSF
LEEDuser Basic Member
2 thumbs up
Sun May 5, 2013, 10:18 am

What about Greenguard instead of Floorscore

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  María Fernanda Aguirre  on 

We have a project pursuing LEED CI and the project team is considering to install laminate flooring which is Greenguard certified but not Floorscore.

2
Technical Information & Public Affairs Manager
UL Environment
LEEDuser Basic Member
356 thumbs up
Sat May 4, 2013, 9:08 pm

(Jacob) Labs and Other Energy Intense Areas to be Included?

NC-2009 EAc3:Enhanced Commissioning
posted by  Brett Beckemeyer  on 

My current project contains a non-manufacturing lab and research facility. The entire lab and research facilities probably incorporate a large portion of the buildings overall power consumption.

2
Fri May 3, 2013, 1:27 pm

Option 2 - Future residential development

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Roberto Meza  on 

Our project is located in a new area in which a residential area will be developed in the near future but is not developed yet. Is it possible to count this area for option 2? Thanks!

3
Sustainable Building Consultant
SPHERA Sustainable Building Consultants
LEEDuser Basic Member
43 thumbs up
Thu May 2, 2013, 3:43 pm

Cork Flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Sheela I  on 

If the Cork flooring exceeds air quality standards established by SCAQMD rule 1168 - Can we consider that it meets the option # 2 of IEQc4.3 "California Department of Heath Services standard"?

3
Technical Information & Public Affairs Manager
UL Environment
LEEDuser Basic Member
356 thumbs up
Thu May 2, 2013, 1:09 pm

Future-Fit Out Spaces LEED Certified or Not

NC-2009 PIf1:Minimum Program Requirements
posted by  Catherine Blakemore  on 

My inquiry is in reference to CIR 10102 I have healthcare project that is a surgical addition at a local hospital. The 2nd floor of this addition is a future fit-out space to be determined.

8
Wed May 1, 2013, 11:52 pm

Can an Off-site parking garage be used to achieve credit?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Breffni O'Rourke  on 

We are examining a project that will include a multi-story parking garage that will not be within the LEED boundary.

8
Wed May 1, 2013, 10:17 pm

Mult Public Connection just over the 2 mile shuttle bus rule

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Johanna Ordaz  on 

Our project is located within an Airport Campus. From our project site to the main terminals is about 1 mile.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed May 1, 2013, 9:59 pm