Same firm as sub-contractor and CxA
NC-2009 EAc3:Enhanced Commissioningposted by Sally Marr on
I am working on a Design-Build project of over 50,000 sf for which the contractor has hired a certain firm to do the testing and balancing.
Streamlined Path
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Heather Holdridge on
I checked off this box in my form on LEED Online and the upload buttons for roof plans and SRI cut sheets have not disappeared. Are the streamlined paths not a pursuable option anymore?
Exterior Envelope Commissioning
NC-2009 IDc1:Innovation in Designposted by Eric Thompson on
Hi The Innovation Catalog shows two precedents of Exterior Envelope Commissioning, one approved and one denied.
No Smoking Signs
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Bonnie Saxon on
We are designing a "High-End" Office Building and Owner does not want the typical white/red no smoking signage at the entrances of the building.
VAV FAN POWER BOX MODELING
NC-2009 EAp2:Minimum Energy Performanceposted by HOUCINE TLEMSANI on
I am working on a project where the base line hvac system is type 6 VAV with fan power boxes.
Recycled Soil and Aggregate
NC-2009 MRc4:Recycled Contentposted by Lyle Axelarris on
I've just learned of a company that remediates contaminated soil and aggregate and then sells the material (for cheaper than virgin material).
Tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
I am working on CS project..i have small doubt If tenant spaces (HVAC, LIGHTING etc) comes under owner/developer scope of work, those spaces should be model as per ASHRAE (in baseline).
FSC certification for drywall subs
NC-2009 MRc7:Certified Woodposted by Doreen Kruschina on
In an industrial project the GC uses a sub for all his interior wall partitions in the office building. This sub wants to use certified doors frames and slabs.
Major renovation zero-lot line project has oil spillage...
NC-2009 SSc3:Brownfield Redevelopmentposted by Maria Porter on
...in the intermediate floors An old building will undergo a major renovation.
Electric car charger
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Noriko Nagazumi on
Hi, Our project is planning to go option2, providing electric charger for vehicles. Are there any requirments for elecric charger, such as mesuring electricity or billing?