CI-2009 EAc3:Measurement and Verificationposted by Mike D on
Does the credit require separate submeters for each equipment or can those be combined? Our project design includes a submeter that is for both the hot water and HAVC system combined.
Transit Rides
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jeremy Poling on
It was asked earlier and doesn't appear to have an answer: is there a published definition of a "transit ride" for the purposes of this credit and exemplary performance?
Number of testing point
Healthcare-v2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Emil Andersson on
Hi. The credit language states that the number of sampling locations will depend on the size of the building and the number of ventilation systems.
parking lot shaded by low-SRI building
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Chris Miller on
The parking lot is shaded by the building for much of the measured time, but the building is not "an architectural device(s) or structure(s) that have a SRI of at least 29".
Rooftop terrace
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Simon Chantal on
We have a rooftop terrace exclusively for employees! Do we have to include the terrace in the roof area or it can be deducted?
Walk off mats required at terrace entrances?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Carly Ruggieri on
One of my residential projects will have terraces on a few floors that are accessible to occupants (part of the amenity spaces).
Historic Building Limitations
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Todd Bundren on
Has anyone been successful with a variance on the 10'-0" walk off-matt rule based on the limitations of a historic building? My building has an 8'-0" vestibule at the 2 main entrances.
Purchasing Wood prior to Obtaining CoC Certificate
NC-2009 MRc7:Certified Woodposted by Maya Karkour on
Hello, Can we count FSC wood products if their supplier obtained the CoC certificate after selling them to the project contractor? In other words, the Contractor purchased wood several months ago
Green Data Center
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
Does anyone know about the modeling baseline of the a data center. Can we use 90.1 or do we have to use something else?
Healthcare Prereq 1 Fixtures and Calcs
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Derek Sylvia on
This is my first time doing the LEED paperwork. I'm not sure I'm using all the correct fixtures while filling out prereq 1. Currenly I only have water closets and lavs filled out.