Forum quick links
sealant applied to clearance between double glazing
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Noriko Nagazumi on
Hi, Sealant which is applied to clearance between two glasses of double glazing window sash shall be evaluated for this credit compliance?
Submittal templates in metric Units
NC-2009 PIf1:Minimum Program Requirementsposted by BABAR MEHMOOD on
We have a project in KSA and want to fill the online submittal templates regarding the Health care but we found the Imperial system for the templates, whereas metric system is follwed for all LEED
FSC COC Certification and Sub Contractors.
NC-2009 MRc7:Certified Woodposted by Leighton Dixon on
I am a General Contractor attempting to achieve MRc7 on an Office Building. In order to achieve the 50% we will need both the Wood Fencing and the Millwork to be FSC Certified.
Slate Porcelain Tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Benjie Herrera on
Where do I classify the above tiles in the LEED online flooring materials listing ? Is it under Flooring: ceramic?
Does blue wrap recycling qualify for innovation credit?
Healthcare-v2009 MRp1:Storage and collection of recyclablesposted by Rosemary Ziemann on
Is blue wrap recycling considered exemplary performance or does it get encompassed by the prerequisite?
Walk off mats
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
Our project is located on the 7th floor of a building. Will the building require a walk-off mat at its entrance and garage entrances to the building?
Systems Required in Cx Scope
Schools-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by John Glaeser on
For fundamental Cx, LEED requires that the following systems be commissioned: HVAC and associated controls, Domestic Water Heating, Lighting Controls and any Renewable Energy Systems.
Extended Stay?
CS-2009 SSc2:Development Density and Community Connectivityposted by Sara Neff on
Hello, my project is close to all required services, and many extended stay facilities. Do extended stay facilities count towards the residential requirement?
FSC 100% Pure Wood Doors
Schools-2009 MRc7:Certified Woodposted by Ema S on
Are there any manufacturers that provide FSC 100% PURE wood doors?
Recycling Rooms
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Saju Varghese on
Should recycling rooms be included in this credit?