Run-off calculations for a site with future extensions
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Valentin Grimaud on
Dear community, We certify a project that will have two extensions in the future. Because of this we cannot earn crédits SSc5.1 and SSc5.2 as per the MPR.
IEQ Ductwork Protection
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jennifer Kissinger on
Should the ductwork that is delivered to the jobsite for installation be wrapped at the fab shop on both ends or can the ends of the duct be wrapped onsite prior to unloading from the truck?
Tenant area with prescribed HVAC system in a CS project
CS-2009 EAp2:Minimum Energy Performanceposted by farhana imran on
Dear Expert, In our CS project the owner wants to limit the tenants to a specific HVAC system with under floor air distribution.
LEED Online Forms
NC-2009 MRc2:Construction Waste Managementposted by Robyn Reichert-Cook on
It wants me to select one of the "additional details" but neither seem correct. What is considered "standard submittal" process?
Level playing field for Recycled Content
NC-2009 MRc4:Recycled Contentposted by barbara anderson on
Can someone please tell me how a LEED specification specialist establishes the recycled content requirement?
Use of existing facilities - Cement Distribution Plant, Colombia
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Edgar Rodriguez on
We are working in Colombia on a new 4,840sqft "dinning room facility" that will serve all users 24/7 of already existing administrative offices and truck drivers (this existing facilities are not c
Calculation for recycling storage area
Healthcare-v2009 MRp1:Storage and collection of recyclablesposted by yanghee pierce on
Hello, How does a project determine the minimum space (sf) required by LEED HC for recycling storage areas? How does a project determine the projected waste volume? Thanks!
LEED Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Bernard Sagaiyaraj on
My project is an office tower located on a plot of land housing 5 other buildings. All hardscape and landscape on the ground outside these buildings are not within the scope of work of my project.
Showers not dedicated to CI project only
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Mike D on
The project consists of one floor of offices located within a building of 12 floors.
Engineering vs Commissioning
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Matthew VanSweden on
For projects under 50,000 sf, can the HVAC engineer and commissioning agent be the same person? Obviously not best practice but strictly speaking, is this allowable?