Forum quick links
DIRTT Millwork on a LEED project
CI-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Valerie Molinski on
Anyone else use this on a project in lieu of tradional millwork fabricated by a local shop? The reason I ask is because we are in the final stages of trying to specify DIRTT millwork for a project
Pilot Credit 43... How many projects have attemped this credit?
Pilot-Credits PC43:Certified Productsposted by Jason Gasperich on
In looking at all of the different certifications available in the marketplace and trying to determine which of these are right for our company and products, I have begun to wonder if there are any
e-waste recycling event open to the public
EBOM-2009 MRc8:Solid waste management - durable goodsposted by Chris Miller on
If the building hosts an electronic waste recycling event that is open to the public, can the e-waste from that event count toward MRc8?
LEED Silver with EAp2 only?
CS-2009 EAc1:Optimize energy performanceposted by Matt Humphreys on
Is it possible for a project to achieve LEED Silver and only meet EAp2 by demonstrating 10% energy cost savings?
Gas metering
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by Oana Stamatin on
In our office building, the annual Gas Consumption accounts for more than 40% of the total annual energy consumption. The gas is used for Heating and for Cooking (for a Restaurant).
To weigh, or not to weigh?
NC-2009 MRc2:Construction waste managementposted by Lawrence Lile on
We have a project with some existing asphalt pavement that will be busted up and used as clean fill on the same project.
Data Centers in LEED v3 - exceptional calculation method?
NC-2009 EAp2:Minimum energy performanceposted by Jeremy Rapoza on
I have a relatively large data center (200kw connected load) in a relatively larger building (250k sf) so that the data center is not the major program space, but is a relatively large minority of
Catch
NC-2009 EAc6:Green powerposted by Jean Marais on
Are there any catches to proving that the RECs that we buy are used only on a specific LEED project? Should I ask the seller to specify the facility's name or something on the REC?
How can we get feedback on the pilot credit?
Pilot-Credits SSpc82:Local food productionposted by Heather DeGrella on
I am wondering if anyone who has posted has been able to get feedback any other way? I tried submitting my same question via LEEDonline and have received no response.
Fixture Replacement
CI-2009 WEp1:Water use reductionposted by Patrick Salmon on
Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary.