RH control with dew point control logic for IEQ 6.2
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by J I on
This project is based in highly humid place, we have used dew point control logic for AHU control. In this control logic, we are controlling 2-way chilled water valve from signal from supply air
Control Via Software Platform
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Andrew Gil on
Hello All, An unfortunate error was made when “multi-occupant space” was assumed by a team member to include a shared office space, and construction is complete.
Elevators (Lift/Escalators) & LEED EAC1 credit
Schools-2009 EAc1:Optimize energy performanceposted by Ameet AA on
Can I include the Elevators (Lift/Escalators) in EAC1 credit calculation using the whole building simulation method? I was told by an Elevator supplier that Regenerative Converter in lift could be
Polluted well water use
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Magda Aghababyan on
Dear all, We have a project that uses water from a polluted well for toilet flushing. The water is of low quality and is not drinkable.
Walking path through another building
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Heather DeGrella on
Our project is on a University campus but is not using the campus approach. University students cut through other campus buildings frequently.
furnitures installed before the flush out
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Benjie Herrera on
Can furnitures be installed before the flush out?
VOC testing method
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Ralph Bicknese on
Does GBCI require a certain testing method for VOC compliance?
Path 2: Storm Water Quantity Control - Discharge into Estuary
CI-2009 SSc1:Site selectionposted by Gail Williams on
Hello, We are working on a project in Ireland where the surface water runoff from the site flows directly into a tidal reach (estuary) without attenuation, as this has been confirmed to be the mo
question about a building at a major port
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carrie Laurendine on
client has a office building (previously developed land) being built along a waterway at a major US port.
Glare Control - Glazing film
NC-2009 IEQc8.1:Daylight and views - daylightposted by Kristina Abrams on
Can a film be installed as a form of glare control for spaces with illuminance levels above 500fc?