Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Silver with EAp2 only?

CS-2009 EAc1:Optimize energy performance
posted by  Matt Humphreys  on 

Is it possible for a project to achieve LEED Silver and only meet EAp2 by demonstrating 10% energy cost savings?

2
Sustainability Director
Lake|Flato Architects
LEEDuser Premium Member
78 thumbs up
Wed Apr 9, 2014, 4:16 pm

Gas metering

EBOM-2009 EAc3.2:Performance measurement - system-level metering
posted by  Oana Stamatin  on 

In our office building, the annual Gas Consumption accounts for more than 40% of the total annual energy consumption. The gas is used for Heating and for Cooking (for a Restaurant).

5
LEED AP BD+C
Colliers International
LEEDuser Basic Member
1 thumbs up
Wed Apr 9, 2014, 10:40 am

To weigh, or not to weigh?

NC-2009 MRc2:Construction waste management
posted by  Lawrence Lile  on 

We have a project with some existing asphalt pavement that will be busted up and used as clean fill on the same project.

2
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Apr 9, 2014, 1:24 am

Data Centers in LEED v3 - exceptional calculation method?

NC-2009 EAp2:Minimum energy performance
posted by  Jeremy Rapoza  on 

I have a relatively large data center (200kw connected load) in a relatively larger building (250k sf) so that the data center is not the major program space, but is a relatively large minority of

3
Default Avatar
Engineer
Tighe & Bond
LEEDuser Basic Member
7 thumbs up
Tue Apr 8, 2014, 8:18 pm

Catch

NC-2009 EAc6:Green power
posted by  Jean Marais  on 

Are there any catches to proving that the RECs that we buy are used only on a specific LEED project? Should I ask the seller to specify the facility's name or something on the REC?

5
Tue Apr 8, 2014, 3:35 pm

How can we get feedback on the pilot credit?

Pilot-Credits SSpc82:Local food production
posted by  Heather DeGrella  on 

I am wondering if anyone who has posted has been able to get feedback any other way? I tried submitting my same question via LEEDonline and have received no response.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Apr 7, 2014, 11:03 pm

Fixture Replacement

CI-2009 WEp1:Water use reduction
posted by  Patrick Salmon  on 

Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary.

5
Mon Apr 7, 2014, 6:44 pm

LEED Interpretation 10372

NC-2009 MRc7:Certified wood
posted by  Tristan Roberts  on 

I don't think the policy it gives is anything new—a lot of us have worked to choose to report wood content as either recycled or FSC, but not both—but FYI, LEED Interpretation 10372 was released on

2
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Mon Apr 7, 2014, 3:34 pm

Pressure Drop adustment in Section 14 Tables

NC-2009 EAp2:Minimum energy performance
posted by  Omar Elrawy  on 

Actually I'am not able to correlate section 14 required inputs under pressure drop column "CFMd", and the requirements of ASHRAE TABLE 6.5.3.1.1 B in (pascals/ in.w).

7
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Mon Apr 7, 2014, 2:31 pm

Option 3 Under LEED ND V4

ND-v2009 SLLc2:Brownfields redevelopment
posted by  Martine Desbois  on 

Could you please explain that Option. I am not sure I understand when it is applicable. Thank you OPTION 3.

3
Fri Apr 4, 2014, 5:23 pm