CS- SSc4.2- Case 2 for a Mixed-use project larger than 300kSF

CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  John McFarland  on 

The LEED User Checklist and the LEED Credit Template calculate the number of bike racks in the following way: "For Core and Shell projects that are larger than 300,000 ft2, an allowance is the squa

4
Environmental Engineer
LEEDuser Basic Member
11 thumbs up
Tue May 6, 2014, 7:00 pm

Baseline Model DCV

NC-2009 EAp2:Minimum energy performance
posted by  Laura Long  on 

I overlooked the demand control requirement for the baseline system in the energy model, and have been directed by the reviewer to install it in 3 rooms based on calculation numbers, which makes se

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue May 6, 2014, 2:37 pm

Very confused - Natural Ventilation

NC-2009 IEQc2:Increased ventilation
posted by  Jeff Potter  on 

My building currently achieves IEQp1 for Mechanical Ventilation rates.

4
Default Avatar
Mechanical Engineer
CJL Engineering
LEEDuser Basic Member
22 thumbs up
Tue May 6, 2014, 2:09 pm

IAQ Testing - Maximum Concentrations

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Donald Green  on 

Can anyone tell me where the Maximum Concentrations listed in the reference guide came from? Who established them, is there a document or website that can be visited? Thank you,

4
Mon May 5, 2014, 7:49 pm

Central Plant - LEED Group Project - 2 Buildings

NC-2009 EAc1:Optimize energy performance
posted by  Victoria Watson  on 

Hi, I have a central plant in 1 building that serves an adjacent building.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon May 5, 2014, 5:12 pm

LEED For Schools 2007 discrepancy

Schools-2009 SSc10:Joint use of facilities
posted by  Esmeralda Ward  on 

This question concerns the LEED for Schools 2007 Rating system. In the reference guide, the Option 1 compliance path does not include Joint parking areas as one of the spaces that could contribute

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Mon May 5, 2014, 4:56 pm

Furniture documentation

NC-2009 MRc4:Recycled content
posted by  Nouran Abdel-Rahman  on 

Can I add the total cost of furniture, and consider it as one item in the LEED form?

4
Mon May 5, 2014, 4:10 pm

No water use

CI-2009 WEp1:Water use reduction
posted by  Henrique Mendes  on 

What happens if we are working on a project that has no water use. No fixture or fittings... How to comply with the prerequisite? Or does that mean that this project is not elegible for LEED?

3
Director
LEAD Consultancy Engineering Services
LEEDuser Premium Member
0 thumbs up
Mon May 5, 2014, 3:54 pm

NC Boundary - campus control

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Phillip Cook  on 

I am working on a building on a hospital campus.

2
Mon May 5, 2014, 3:17 am

Modeling buildings w/ no proposed cooling; Workaround?

NC-2009 EAc1:Optimize energy performance
posted by  Jason Chenard, PE  on 

On Sept 12, 2012 there was a thread: "Proposed model, CAV system without cooling system". It references a "high temperature set point work around".

3
Sr. Mechanical Engineer
Oak Point Associates
LEEDuser Basic Member
1 thumbs up
Sat May 3, 2014, 11:01 pm