Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Alternative Compliance Path: CS 2009 EAp2/EAc1

NC-2009 EAc1:Optimize Energy Performance
posted by  Jek Villarba  on 

I'm currently working on a Core and Shell project.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 30, 2014, 5:41 pm

Military Base contamination

NC-2009 SSc3:Brownfield Redevelopment
posted by  Kim Lombard  on 

Our client on a Military base has uncovered asbestos piping underground during construction. They have properly disposed of the contamination as a normal SOP.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jul 30, 2014, 1:34 pm

Kindergarten restooms w/ no occupancy sensor-OK or huge problem?

NC-2009 EAp2:Minimum Energy Performance
posted by  Kathryn West  on 

discovered a potential oversight on a building design: some restrooms intended to be used by very small kids are equipped with light switches and no occupancy sensors.

5
Tue Jul 29, 2014, 7:39 pm

Site Assessment documentation

Pilot-Credits SSpc45:Site assessment
posted by  Mara Baum  on 

We've been following the credit requirements throughout the design process and are now starting documentation.

3
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Tue Jul 29, 2014, 5:50 pm

Combining Option 2 and Option 3

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Meghan Ward  on 

We are working on an Office project located 3 miles from a rail station.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jul 29, 2014, 2:18 pm

Revised Section 1 4 Tables

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

For the Energy Model I have used the (architectural drawing) for the proposed model, some wall sections were provided with its R-values from the manufacturer too.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Jul 29, 2014, 2:11 pm

Data centre and office

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Chilufya Lombe  on 

Hi, we have 2 buildings on our site pursuing two separate certifications. One is an office building and the other a data centre (one client).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jul 29, 2014, 2:09 pm

Bicycle paths for Kindergarten

Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Charalampos Giannikopoulos  on 

Does anyone know whether bicycle paths are necessary at a kindergarten facility with no students above grade 3 level? Bicycle storage will be only available to staff members.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Jul 29, 2014, 8:22 am

ASTM Comparison

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Michael E. Edmonds-Bauer  on 

We have a paint that has been tested under ASTM D5201 and some other with ASTM D3960, but the Green Seal standard GS-11 states that the tested method needs to be the ASTM D6886-03. Does anybody kn

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jul 29, 2014, 3:11 am

Number of workstations for Hotel rooms

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Nelina Loiselle  on 

According to the IEQ Space Matrix, hotel rooms can be included in 6.2/6.2. So if you choose to include hotel rooms for IEQc6.1 and 6.2 do you count each room as one workstation?

3
Mon Jul 28, 2014, 9:41 pm