NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Brightworks Sustainability on
If local requirements are not as stringent as LEED requirements, are we still required to meet LEED requirements beyond local standards?
Default Space Susage Types - are there definitions?
CI-2009 PIf3:Occupant and Usage Dataposted by Stacey Olson on
I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?
Increasing Baseline Static Pressure for Sound Regulations
Schools-NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
We're working on a project where in order to comply with local noise regulation requirements, the Proposed design required indoor air handling equipment with fully ducted exhaust/intake air connect
Documents Required For pre-certification for LEED V4 Core Shell
CS-v4 MPR1:Must be in a permanent location on existing landposted by Aqrab Ali Rana on
I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an
IAQ Management Plan during Construction
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Marge Barradas Machin on
Dear all, According to your experience, how often would inspections should take place?
Resin floor
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Martin Meehan on
Would a resin floor be considered a floor coating (under IEQc4.2 and controlled VOC content), or a polymeric flooring system (under IEQc4.3 and controlled emissions)? I find that according to the
ERV supply and return fans
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We have grouped many conditioned zones which the OA will be supplied with central DOA and ERV system. The air from the ERV will be deliver by large fan and return by also a large fan.
Primer for Waterproofing membrane
NC-v4 EQc2:Low emitting materialsposted by Leanne Conrad on
In the requirements for this credit, the building exterior is defined as "everything outside and inclusive of the primary and secondary weatherproofing system, such as waterproofing membranes and a
diverse uses
NC-v4 LTc4:Surrounding density and diverse usesposted by sepideh khodadadi on
our project is a big shopping center with almost all the diverse uses (such as restaurant,bank,etc.) can that help us get the credit without calculating the surrounding diverse uses?
SMACNA Ductwork Protection Guidelines
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Ciaran McCabe on
In order to qualify for this credit is it acceptable if the duct work is wrapped once it arrived on site OR should it arrive pre-wrapped.