Forum quick links
Phenol Formaldehyde (PF) Resins OK with v3?
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Brian Salazar on
The CI forum seems to have more traffic, so I am reposting here from CS.... Hello - I am working on a project where the subcontractor has requested we approved a product that uses a WBP Phenolic F
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Commingled or Source Separated
NC-2009 MRc2:Construction Waste Managementposted by Risto Beatty on
Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?
Pilot Credit Closed?
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Angela Wisely on
It appears this pilot credit closed on August 16th. I believe I can still submit it as long as I registered under the pilot credit before that date, correct?
PTAC Monitoring
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Dutchie Grossweiner on
In a mixed use building, the residential dwelling units are being provided outdoor air via PTAC systems (apartment size determines the number of PTAC units).
water cooled chillers
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus, I am working on a project in KSA of about 404330ft2.
Rug
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Alicia Costas Freire on
Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t