Forum quick links
If Purchasing Chilled Water from Campus Central Plant...
NC-2009 EAp3:Fundamental refrigerant managementposted by Nelina Loiselle on
We have a project that we are modeling as purchased chilled water and steam because it is on a campus that includes a central plant. The campus sells the utilities to the department.
Documentation for Plan
ND-Plan-v4 GIBp1:Certified green buildingposted by David West on
For certification of at the plan stage I assume that GBCI doesn't expect a building to be constructed and certified.
Datacentre Requirements
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.
Sound Transmission - achievable?
NC-v4 EQc9:Acoustic performanceposted by Tim Habraken on
For a project, we are dealing with the following situtation: we have small meeting rooms, situated (as "boxes") in an open-office plan.
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?
What is the difference
NC-2009 IEQp1:Minimum indoor air quality performanceposted by John Pugh on
What is the difference between breathing zone outdoor airflow and room outdoor airflow rate? How do I find the room outdoor airflow rate for bedroom/living room type spaces Thanks.
Reduction of impervious area
NC-2009 SSc6.2:Stormwater design - quality controlposted by Danielle Spicer on
I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e
audit of land-fill materials only?
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Jutta Berns on
our hotel project already has in place a rigorous waste diversion programme, where 80%+ is diverted from landfill.
Flush-Out Requirement for a Naturally Ventilated Building
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Eric Carbonnier on
The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.
Steel extraction location
NC-2009 MRc5:Regional materialsposted by Tiffany Moore on
I feel like broken record on this topic, because I know I've been through this before.