Forum quick links
5% path
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Andres Giraldo on
How can we set the form to achieve the 5% of the total site area as described in the reference guide. Because in LEED online, it's the 25% path set as default.
retail spaces in office building
CS-2009 IEQc2:Increased Ventilationposted by Anna Bak on
Hi, In our C&S project the investor provides AHUs to supply fresh air to offices.
Data Center Calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
For Data center project, I've supplied the designer team with the Data Center Calculator, so that they'd be able to fill it in with their project data. However, There are some questions in relation
Absorptive Materials
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Omar Elrawy on
Dear all, I actually do know what is an absorptive material but only by logic/sense.
Development Density - In an industrial area?
CS-2009 SSc2:Development Density and Community Connectivityposted by Vinoth Muthusamy on
I have a Query on SS C 2 Option 1 Development Density - A Warehouse building being developed in an industrial area, can I account nearby industry buildings in the density calculation.
WinAir Software to Meet Requirement
NC-2009 IEQc2:Increased Ventilationposted by Roberto Meza on
Has anyone used the WinAir from the Ecotect software to meet the credit requirements or does anyone know if this software can be used? Thanks!
Radiant tube
NC-2009 EAp2:Minimum Energy Performanceposted by LEEDme Lorenzi on
A radiant tube gas can be associated with the table 6.8.1E ASHRAE 2007?
SLL p1 -Smart Location
ND-v2009 SLLp1:Smart locationposted by Rita Barata on
Hi Eliot, Just looking at different hypothesis for new developments to be classified as LEED-ND, as one of the examples I can send you this link - http://www.dubaimaritimecity.com/ Would this for
Grouping of the FEV spots
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Martin Tremors on
I have a project where due to the irregular layout of the building, there is no one single grouping of spots large enough so that they are all close enough to the entrance to satisfy the "preferred
Seeking feedback for denied credit
NC-2009 EAc1:Optimize Energy Performanceposted by Brian Harris on
Please see below for comments from USGBC relative to our design submittal for Portland Fire & Rescue Station 21 (1000020729). We've sent inquires to USGBC several times with no response.