Forum quick links
ETo units and ETo calculation software
NC-2009 WEc1:Water Efficient Landscapingposted by Renaud Gay on
Hi all, I'd like to ask again the same question that in LEED form ETo is expressed in inch/month for July. This is not super clear but looks like this.
Independence of CxA - enhanced commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Qian Tang on
Hello experts, i'm not sure about the independence of the CxA at enhanced commissioning for a projekt lager than 50,000 ft2. Is the CxA allowed to be a member of a subsidiary firm of the builder-o
Motor Power
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear All, For modelling pumps for my Proposed design, I have a manufacturer's datasheet for a Variable speed pump (Secondary pump) with the following values: Duty Flow = 209.5 gpm Du
LEED NC Credit EAc2 for LEED ID+C project as an ID credit
CI-2009 IDc1:Innovation in Designposted by Amit Ahiel on
I have researched this and see that we can earn credit for a Thermo Solar Water system on a LEED ID+C project. The question is, will we only earn 1 point or the full set of points per the NC system
Regular Maintenance Program for Pressure Washing Concrete
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Laura Long on
Hi, Could anyone tell me what would be considered "regular" maintenance for pressure washing concrete to be able to use the higher SRI value for the concrete?
Measurement doubt
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Andres Giraldo on
We have large area of natural landscape with vegetative and adapted vegetation in certain percent of it.
LEED Boundary & Covered Parking (Vegetated Roof)
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Rashida Mogri on
We designed a building/garage right up against an existing building/garage.
Anticipated Tenant Fit Out
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo
Sound Transmission
NC-v4 EQc9:Acoustic performanceposted by Mark Zoeteman on
Sound transmission requirements for adjacency combinations are listed in Reference Manual Table 1.
M&V Plan Doubt
NC-2009 EAc5:Measurement and Verificationposted by Marina Andrade on
Hi everyone, i'm studying the protocol of measurement & verification, and checked out some necessary points which must be in the plan but did not quite understand.