ETo units and ETo calculation software

NC-2009 WEc1:Water Efficient Landscaping
posted by  Renaud Gay  on 

Hi all, I'd like to ask again the same question that in LEED form ETo is expressed in inch/month for July. This is not super clear but looks like this.

0

Independence of CxA - enhanced commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Qian Tang  on 

Hello experts, i'm not sure about the independence of the CxA at enhanced commissioning for a projekt lager than 50,000 ft2. Is the CxA allowed to be a member of a subsidiary firm of the builder-o

1
Tue Aug 26, 2014, 10:35 pm

Motor Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Dear All, For modelling pumps for my Proposed design, I have a manufacturer's datasheet for a Variable speed pump (Secondary pump) with the following values: Duty Flow = 209.5 gpm Du

1
Tue Aug 26, 2014, 1:34 pm

LEED NC Credit EAc2 for LEED ID+C project as an ID credit

CI-2009 IDc1:Innovation in Design
posted by  Amit Ahiel  on 

I have researched this and see that we can earn credit for a Thermo Solar Water system on a LEED ID+C project. The question is, will we only earn 1 point or the full set of points per the NC system

0

Regular Maintenance Program for Pressure Washing Concrete

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Laura Long  on 

Hi, Could anyone tell me what would be considered "regular" maintenance for pressure washing concrete to be able to use the higher SRI value for the concrete?

1
Wed Aug 27, 2014, 1:59 pm

Measurement doubt

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Andres Giraldo  on 

We have large area of natural landscape with vegetative and adapted vegetation in certain percent of it.

1
Thu Dec 11, 2014, 5:36 pm

LEED Boundary & Covered Parking (Vegetated Roof)

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Rashida Mogri  on 

We designed a building/garage right up against an existing building/garage.

1
Tue Sep 16, 2014, 3:33 pm

Anticipated Tenant Fit Out

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Paula Hernandez  on 

Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo

0

Sound Transmission

NC-v4 EQc9:Acoustic performance
posted by  Mark Zoeteman  on 

Sound transmission requirements for adjacency combinations are listed in Reference Manual Table 1.

1
Fri Apr 15, 2016, 6:58 pm

M&V Plan Doubt

NC-2009 EAc5:Measurement and Verification
posted by  Marina Andrade  on 

Hi everyone, i'm studying the protocol of measurement & verification, and checked out some necessary points which must be in the plan but did not quite understand.

1
Thu Aug 28, 2014, 2:28 pm