Forum quick links
Query Regarding use of Treated RO reject water from ETP for WEP1
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ashwin Kumar on
We plan to use RO Reject Water which is generated from within the LEED project Boundary for a Factory Project (registered within a Master Site Campus) towards the Flushing requirement. As mentioned
In which construction phase can I certify my building?
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Hazem Yusuf on
Construction phase of an office building is consisting of multi stages.
Process Loads in LEEDOnline Form
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear all, I need to know if anyone did experience that before.
rigole system/french drain
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Doreen Kruschina on
Hi, we are implementing a `Rigole´ for TSS removal. Translators dish out `french drain´ for what i would describe as a bioswale with additional storage capacity due to gravel packages or the alike.
Verification of pressure difference
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Francisco Aguirre on
Hi all, We are developing a NC Campus project located in the Arab Gulf.
Cellulose Insulation and CA 01350
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Allison Zuchman on
I have found manufacturer documentation for all materials on a school project required to meet IEQ4.6 except for one product, a cellulose insulation (ICC Celbar).
Table EAp2-5
NC-2009 EAp2:Minimum Energy Performanceposted by Isabel Santos on
Dear all, I am having one difficulty in filling the form of EAp2.
Tenant's Project Scope
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Sunayana Jain on
I have a small office fit-out which is served by a 5 RTUs exclusively. In the tenant's scope of work is only the ductwork and lighting with lighting controls.
SSc9.2 Defining "Direct Exterior Access"
Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patientsposted by Daniel Herstine on
We have patient courtyards that serve four (4) patient units each.
what defines a roof for this credit?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin Holdenried on
What defines a roof for this credit? Is it slope, construction, or function? I have a project with a mansard roof. It has a 65% slope, very steep.