Forum quick links
Declaration of Regional Material
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Osman Faroq on
Dear All,
Equations and calc methods
EBOM-v4.1 EAp3:Energy Performanceposted by Ricardo Filho on
I am doing some research on LEED v4.1 O+M and I have a number of questions.
I am going to post them here (I know it is a lot) hoping someone knows the answer for a few of them, maybe.
LEED AP Homes
Mid-Rise-v4 INc2:LEED AP for Homesposted by Laura Rojas on
AI am working on a Residential BD+C
Multifamily Homes project and I was wondering if to earn the point for LEED
Flush-out area
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Charalampos Giannikopoulos on
Could you kindly confirm than only the net (excluding wall surfaces, shafts, etc.) and not gross area of a building needs to be considered for flush-out?
Two separate buildings / 2 waste haulers / 1 report
NC-v4 MRp2:Construction and demolition waste management planningposted by Allison Para on
Hello Users,
Views credit
CI-v4.1 EQc8:Quality Viewsposted by Denise Bates on
in a CI project where you do not have access to the building's VLT, is there a default value we can use? not finding guidance on it
MEPC Data Center Calculator Example
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am looking for example for MEPC Data Center Calculator, I dont have any experince filling that sheet, can someone guide me where should I look at ?
TIA
BUG Method - Recessed Ceiling Exterior Downlights
NC-v4 SSc6:Light pollution reductionposted by Edgar Arevalo on
There is project where the only exterior lighting is two ceiling recessed downlighting fixtures installed at the outdoor canopy of the main entrance. According to the BUG method, B (backlight
Regularly used exterior entrances
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Julie Hardy on
Hello,
Open-plan office classification under Thermal Comfort controls
NC-v4 EQc5:Thermal comfortposted by Norbert Harmathy on
Hello,
We are applying for the v4 New Construction Thermal Comfort credit and will have manual controls (overriding automatic) of air temperatures within offices and shared spaces.