Forum quick links
MERV 13 for Make-up air?
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Esteban Martinez on
We have a Cafeteria-Restaurant space complying with 62.1 throughout an exhaust system with make-up air directly from the outside.
Electric fueling stations outside project boundary
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Bernd Schadl on
Our Core and Shell project is a multi-tenant business building with a parking garage (underground) and is part of a campus area with some more buildings and parking areas.
Pilot Credit SSpc7 Light Pollution Reduction
Pilot-Credits SSpc7:Light pollution reductionposted by William Kelly on
We are doing a project where we are renovating the whole interior of an existing building but we are not renovating the exterior portion of the building.
Timeline issue of handling waste streams
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Magda Aghababyan on
Hi, We conducted a waste stream audit at a facility where they divert 100% of their paper, cardboard waste, tubelights, CFL lamps etc. for recycling.
SS credit 3.1 Schedules and Rides per day
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Daniel Garavito on
My project is 0.5 miles from Grand central station NYC, in order to achieve exemplary performance i have to state rides per day, this means for example each time subway stops in that station counts
Bike sharing as "low-emitting" vehicle option?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by American University on
Would providing a bike sharing station for 3% of the occupants count for option 3 or 4 do you think? Would we have to provide membership to the service also?
Shopping center HVAC system - Mall and tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to model the baseline HVAC system of a specific shopping center. In this project, it was specified the HVAC system which serves the mall building and some of the stores.
Table PIf3-1 Space Usage Type
NC-2009 PIf3:Occupant and Usage Dataposted by Maggie Edelstein on
We have parking spaces in the first floor of our building, for tenants of the project space. The square footage of the parking is not included in the project Gross Floor Area.
LEED Health Care 2009 MR Prerequisite 2: PBT Source Reduction
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Andrea Breen on
For testing fly ash to be used in concrete, for the 5 ppb limit, are there any sampling requirements?