Forum quick links
The building will provide
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
The building will provide entrance mats for all major entrances. The building have retail units at the ground floor. Do each of those units have to have mats as well?
Can I to charge bicycle parking?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by nathalie monory on
Hello everybody My client charging the car park entrance, and he would like to do a same for parking bicycles. I know that the showers should be available for free, but what about for the bike rack
private minibus VS shuttle
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Adrienn Gelesz on
Hi, does any one know if there is any difference in a "shuttle" and a "private minibus"? Are these term interchangable?
CO2 sensors in future spaces
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Saju Varghese on
We are currently doing a university building shared by two schools. Thus some of the areas of the bldg are to be develope in the future.
LEED certification for identical buildings
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi All, We have a project coming up where LEED certification is being pursued for multiple identical villas. How does USGBC treat such a project.
WEp1 fixture group for bicyclists
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jaclyn Whitaker on
Does anyone have experience with including a bicyclist fixture group for 5% of the project's FTE (and Peak Transients) for showers (1 shower per day per FTE for this bicyclist fixture group) rather
Paint VoC content certification
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Magda Aghababyan on
Hello, We did a paint VoC test with an independent party for a type of paint that one of our client is using (because the manufacturer didn't have technical documentation to provide us).
List energy end uses
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Mike D on
"The M and V Plan omits the table or listing of the project’s energy end uses as required by the form." However, the Plan we have submitted lists the following: Locations and types of energy meter
Innovation Credit: Electric charge stations
EBOM-2009 IOc1:Innovation in Operationsposted by Mike Stopka on
Has anyone ever pursued an innovation & design credit with charging stations? A project I am working on is looking to install 6 stations on site and promote/market them
Default Occupancy and WEp1
NC-2009 PIf3:Occupant and Usage Dataposted by mary ostafi on
I am working on a LEED-CS 2009 project that is half office and half lab space. Not all of the tenants are certain yet so we opted to select the 'default occupancy' option.