Minimum Recycling Area for residential building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by SUNG SU KIM on
Hi guys. We are pursuing LEED v2.2. Our project have five separate residential building. We will provide recycling area where each building entrance.
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction When heating and cooling to a zone is controlled by separate thermostatic controls shall heating setpoint exceed cooling setpoint. In our C&
Exterior Walls and Ceiling Furred Out
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Sallyann Kluz on
We have an existing building that lacked insulation in exterior walls as well as the ceiling.
Hardscape
NC-2009 PIf2:Project Summary Detailsposted by Chris DeVolder on
Hi all, Thanks for the comments/feedback above. We have a small playing field/recreation field within our boundary adjacent to our building.
Manufacturing and Public Transit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Andrew Sheridan on
We are working towards achieving this credit for a large manufacturing facility that runs 24 hours a day with 3 manufacturing shifts.
Feedback for ACP Program
Pilot-Credits EApc67:Energy Jumpstartposted by Elizabeth Crenshaw Hammitt on
Hi there LEED community, Our project team has just wrapped the performance period, and we are in the process of gathering documents and plan to submit our application in one week.
LEED Site Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Heather Holdridge on
We are working on a Core & Shell project and our LEED site boundary includes a large parking lot and landscape area along with the building on the plot.
Native or adapted vegetation area calculation
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Sofia Otterheim on
Hi Everyone According to 2009 version LEED reference guide there are two ways to calculate out native or adapted vegetation area.
Tons vs Yards
CS-2009 MRc2:Construction Waste Managementposted by Kevin Short on
My waste hauler has given receipts in both tons and yards. I am using tons for the credit, is there some conversion factor I can use? The receipts in question are for landfill and wood.
Local Code more stringent than Ashrae 62.1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gaston Viau on
Our project has to achieve CA Title 24 which is more stringent than Ashrae 62.1.