Natural Ventilation Interpretation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Nandana Kumar on
Hi, Can anyone kindly interpret the sentence below from ASHRAE 62.1 2007 'All naturally ventilated spaces must be within 25' of (and permanently open to) operable wall or roof openings to the outdo
Default Budget %
CI-2009 MRc5:Regional materialsposted by Nate Maniktala on
What is the 'Default Budget Percent'? In NC, it is as stated as 45% but CI does not mention this percentage specifically.
Are glulam beams included in credit EQ4.4
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Joanne Sawatzky on
We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis
LEED-CS v2.0
NC-2009 PIf1:Minimum Program Requirementsposted by Jodie Clarke on
I have a project that registered using LEED-CS v2.0 in 2007.
submit to leed-online compliance
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ron Dean on
Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I
GCBI project review cost
NC-2009 PIf2:Project Summary Detailsposted by Michael Kros on
I submitted a project for D&C review. The project is a 25,000 SF addition to an already LEED certified building of 60,000 SF.
Reuse of Light Fixtures and Mechanical Vents
CI-2009 IDc1:Innovation in designposted by Caro Wilbanks on
I am wondering if the reuse of light fixtures and mechanical vents has ever been used towards an ID credit. I understand that these divisions are not counted towards any of the MR credits.
Baseline System Selection - larger heated space - smaller cooled
NC-2009 EAp2:Minimum energy performanceposted by Don Carsto on
Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.
ASHRAE 90.1 appendix G - VAV modelisation in baseline system 7
NC-2009 EAc1:Optimize energy performanceposted by Julien Daclin on
Hi, I have a question about the interpretation of section G3.1.3.13 (VAV minimum flow setpoints).
posts on original LEED-HC forum
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tristan Roberts on
For everyone's reference, there are a number of forum posts that were made to LEEDuser's general LE