Natural Ventilation Interpretation

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Nandana Kumar  on 

Hi, Can anyone kindly interpret the sentence below from ASHRAE 62.1 2007 'All naturally ventilated spaces must be within 25' of (and permanently open to) operable wall or roof openings to the outdo

1
Fri Dec 21, 2012, 5:20 pm

Default Budget %

CI-2009 MRc5:Regional materials
posted by  Nate Maniktala  on 

What is the 'Default Budget Percent'? In NC, it is as stated as 45% but CI does not mention this percentage specifically.

1
Fri Dec 7, 2012, 5:55 pm

Are glulam beams included in credit EQ4.4

NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Joanne Sawatzky  on 

We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis

1
Fri Dec 7, 2012, 11:07 pm

LEED-CS v2.0

NC-2009 PIf1:Minimum Program Requirements
posted by  Jodie Clarke  on 

I have a project that registered using LEED-CS v2.0 in 2007.

1
Mon Dec 10, 2012, 2:13 pm

submit to leed-online compliance

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Ron Dean  on 

Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I

1
Mon Dec 10, 2012, 4:30 pm

GCBI project review cost

NC-2009 PIf2:Project Summary Details
posted by  Michael Kros  on 

I submitted a project for D&C review. The project is a 25,000 SF addition to an already LEED certified building of 60,000 SF.

1
Mon Dec 10, 2012, 10:10 pm

Reuse of Light Fixtures and Mechanical Vents

CI-2009 IDc1:Innovation in design
posted by  Caro Wilbanks  on 

I am wondering if the reuse of light fixtures and mechanical vents has ever been used towards an ID credit. I understand that these divisions are not counted towards any of the MR credits.

1
Fri Dec 14, 2012, 7:56 pm

Baseline System Selection - larger heated space - smaller cooled

NC-2009 EAp2:Minimum energy performance
posted by  Don Carsto  on 

Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.

1
Tue Dec 11, 2012, 2:46 pm

ASHRAE 90.1 appendix G - VAV modelisation in baseline system 7

NC-2009 EAc1:Optimize energy performance
posted by  Julien Daclin  on 

Hi, I have a question about the interpretation of section G3.1.3.13 (VAV minimum flow setpoints).

1
Wed Dec 12, 2012, 3:36 pm

posts on original LEED-HC forum

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Tristan Roberts  on 

For everyone's reference, there are a number of forum posts that were made to LEEDuser's general LE

1
Sun Nov 10, 2013, 10:09 am