Forum quick links
Bonus point for the Regional Priority Credits
EBOM-2009 RPc1:Regional Priorityposted by Sundararaj Subburaman on
We browsed the USGBC website for Regional Priority Credits outside US in the following link: www.usgbc.org/DisplayPage.aspx?CMSPageID=2435 It is mentioned that earning up to four of the six credit
custom-made refrigerator for EBOM project
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Jorng-ren Chern on
I am working on EBOM for an old office building which includes an employee cafeteria.
1 Additional Bonus Point for earning all 4 RPCs
CI-2009 RPc1:Regional Priorityposted by Nandana Kumar on
Hi, I wanted to understand if it is possible to earn 1 additional bonus points, if the project has earned all 4 points under the RPCs. or is the interpretation of earning only a maximum 4 RPCs
scope of materials
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Adam Targowski on
I would like to clarify what should be included in the calculations for this credit.
LUSTs discovered and remediated
CS-2009 SSc3:Brownfield Redevelopmentposted by charles bell on
Project is urban core multi-story mixed use CS. Leaking Underground Storage was discovered and remediated (including soil) and identification of water wells in the vicinity.
Requirement for CO2 sensor and OA measurement device
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Barbara McCrary on
I found a thread from 2011 discussing the Addendas released 5/9/11 removing the footnote that was previously changed under Addenda reliease 9/19/10.
Best Timing for ASHRAE Audit?
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Nelina Loiselle on
What is the best timing for the ASHRAE Level I walkthrough audit? We have our energy star label already, are working on getting our tracking in place for the other credits.
Core Fixtures Existing, Tenant to Install Additional Fixtures
CI-2009 WEc1:Water Use Reductionposted by Nelina Loiselle on
I have a LEED-CI project in which there is one toilet that is EXISTING in the base building and NOT A PART OF THE SCOPE of the tenant improvement.
Motorcycles parking space
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Rosana Correa on
In our project, some of the parking spaces are specific to motorcycles, with smaller areas than in car's spaces.
Category for IEQ Credit 4.1
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by S D on
I am new to the LEED process. I am having trouble determining which categories the following products fall under for the purpose of IEQ Credit 4.1.