Forum quick links
EAc1: equivalence energy calculation for french project ???
NC-2009 EAc1:Optimize Energy Performanceposted by Nicolas MOLLE on
Hello, I'd like to know if anyone can appreciate the levl of results for a french project under ASHRAE ?
New & exisiting space and minimum requirements?
NC-2009 EAp2:Minimum Energy Performanceposted by Chris Miller on
I have a project that is an exisiting building renovation with an addition. I understand my energy model will be based on a combination of the new & existing.
How to document a pre-rinse spray valve in the form online????
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Robert Robison on
Review comments have requested that I include the pre-rinse spray valve in the hotel kitchen in my water usage calculations.
Default worst-case VOC Values?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Erin Holdenried on
We have an international project for which all of the paints and coatings used are proven compliant, except one latex wall primer.
Polyurethane foam
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Adriana Hansen on
I'm having trouble classifying the product polyurethane foam. I understand that this product is an aerosol adhesive, but I not sure. Still on the same subject, about the ieq c4.1 template in versio
Rural Density
CS-2009 SSc2:Development Density and Community Connectivityposted by Jeffrey Guest on
Our project meets the service part of Option 2, but the 10 units per acre is not so easy in this rural development. Our County rarely approves 10 unit per acre density's.
Equipment Efficiency Section 1.4
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by John Kitsalis on
This section is a little confusing and I am putting my interpretation of it up.
Informal Meeting Spaces
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by William Weaver on
Intermixed throughout our open office floor plan, we have included a number of casual seating arrangements to facilitate informal, impromptu meetings.
Recycling in Malaysia
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Joel Cesare on
We have a LEED CI project in an office building in Kuala Lumpur and the local contractor is telling us there is no option to recycle.
Loading Dock?
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Patrick Culhane on
We are undertaking the space inventory in advance of our audit. The building is a +/- 1,000,000 sf office tower. I'm wondering if the audit needs to include the loading dock area.