"Non-Structural" material/Interior walls

Pilot-Credits MRpc52:Material multi-attribute assessment
posted by  stephanie fagan  on 

Would metal framed interior walls need to be excluded from the calculations for this pilot credit?

1
Fri Mar 23, 2012, 12:52 pm

Window to wall ratio

NC-2009 EAp2:Minimum energy performance
posted by  Katherine Ann Resurreccion  on 

I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated.

1
Fri Mar 23, 2012, 12:53 pm

'installed by substantial completion of construction'

Schools-2009 EAc2:On-site renewable energy
posted by  Sara Goenner Curlee  on 

The letter template has a sign-off for the owner/agent to declare that the renewable energy source (in my case PV solar thermal) is 'installed by substantial completion of construction.' We will be

1
Fri Mar 23, 2012, 4:46 pm

MR3 Materials Reuse and MR4 Recycled Content - "Double Dipping"

CI-2009 MRc4:Recycled content
posted by  Studio 804  on 

Did … did you just double-dip that chip?..... I'm working on a project that emphasizes the use of reclaimed materials and materials with recycled content and have come across a few items for which

1
Mon Mar 26, 2012, 2:22 am

melamine-urea-formaldehyde (MUF)?

NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Ward Miller  on 

Does anyone have experience or know whether GBCI accepts MDF with melamine-urea-formaldehyde (MUF) in it for IEQc4.4?

1
Mon Mar 26, 2012, 3:05 pm

Shower calculation

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Michael Smithing  on 

We have 330 FTE and 2 showers. The credit requirement is 1 shower for the first 100 FTE and 1 for each subsequent 200 FTE.

1
Tue Mar 27, 2012, 1:55 pm

Baseline PTAC sizing

NC-2009 EAp2:Minimum energy performance
posted by  April Ambrose  on 

I have a residential facility seeking LEED v2009 certification with small room loads (approx 2,000 BTU/hr).

1
Tue Mar 27, 2012, 5:11 pm

Existing Parking Lot

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Dan Forino  on 

For a NC 2009 project we are building an addition to a building on an which will replace part of an existing campus parking lot.

1
Fri Apr 6, 2012, 2:41 pm

Confidential Materials Cost Budget

CI-2009 MRc4:Recycled content
posted by  samala hartley  on 

This LEED CI project would like to maintain privacy in regards to their materials budget.

1
Tue Apr 10, 2012, 10:34 pm