"Non-Structural" material/Interior walls
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by stephanie fagan on
Would metal framed interior walls need to be excluded from the calculations for this pilot credit?
Window to wall ratio
NC-2009 EAp2:Minimum energy performanceposted by Katherine Ann Resurreccion on
I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated.
'installed by substantial completion of construction'
Schools-2009 EAc2:On-site renewable energyposted by Sara Goenner Curlee on
The letter template has a sign-off for the owner/agent to declare that the renewable energy source (in my case PV solar thermal) is 'installed by substantial completion of construction.' We will be
What is the current definition of Alternative Fuel Vehicles?
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Elizabeth Durney on
Does it include flexfuel cars?
MR3 Materials Reuse and MR4 Recycled Content - "Double Dipping"
CI-2009 MRc4:Recycled contentposted by Studio 804 on
Did … did you just double-dip that chip?..... I'm working on a project that emphasizes the use of reclaimed materials and materials with recycled content and have come across a few items for which
melamine-urea-formaldehyde (MUF)?
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Ward Miller on
Does anyone have experience or know whether GBCI accepts MDF with melamine-urea-formaldehyde (MUF) in it for IEQc4.4?
Shower calculation
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Michael Smithing on
We have 330 FTE and 2 showers. The credit requirement is 1 shower for the first 100 FTE and 1 for each subsequent 200 FTE.
Baseline PTAC sizing
NC-2009 EAp2:Minimum energy performanceposted by April Ambrose on
I have a residential facility seeking LEED v2009 certification with small room loads (approx 2,000 BTU/hr).
Existing Parking Lot
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Dan Forino on
For a NC 2009 project we are building an addition to a building on an which will replace part of an existing campus parking lot.
Confidential Materials Cost Budget
CI-2009 MRc4:Recycled contentposted by samala hartley on
This LEED CI project would like to maintain privacy in regards to their materials budget.