Emergency generator fule meter
CI-2009 EAc3:Measurement and Verificationposted by Edwin Wealend on
Hi we have a LEED CI project that is served by an emergency back-up generator that serves multiple floors. Is it really a requirement to meter emergency back-up generator fuel?
Tenant Sub-Metering
CI-2009 EAc3:Measurement and Verificationposted by Donald Green on
Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.
Tenant Submetering
CI-2009 EAc3:Measurement and Verificationposted by sompoche sirichote on
I have read the previous threads but still not sure about the tenant submetering. The Table 2 in LEED CI guideline indicates that no submeter is required for the cooling if it is included in prora
initial cost for lease
CI-2009 EAc3:Measurement and Verificationposted by Monica Hue on
Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?
Owns Building
CI-2009 EAc3:Measurement and Verificationposted by Kristopher Croghan on
If a client owns all of the interior space, then I assume that they would obtain this credit, since they pay all of their energy and water bills. Would I be correct?
Water metering
CI-2009 EAc3:Measurement and Verificationposted by Ciaran McCabe on
Does the cold water feed to tenant spaces need to be metered for this credit. Cold water consumption does not feature in the energy model.
LEED-CI without an energy model
CI-2009 EAc3:Measurement and Verificationposted by Brightworks Sustainability on
I'm working on a LEED-CI project occupying 100% of the tenant space.
Third-Party Energy Reporting Innovation Credit
CI-2009 EAc3:Measurement and Verificationposted by Garrett Ferguson on
Does anyone know if the Exemplary Performance option for BD+C given for sharing energy data via a Third-party template is available for ID+C? I haven't seen anything about it either way.
Sustainability dashboard instead of sub-meter?
CI-2009 EAc3:Measurement and Verificationposted by Crista Shopis on
I am trying to think through an alternative compliance. Please humor me. So I am working on a building where the tenant owns and occupies the entire building.