Post a question or comment
Credit Filters
Optimize Energy Performance—HVAC
Filter by location
Forum
Topic
Replies
Recent

EAc1.3 Simulation for LEED CI

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Jimena Etchegaray  on 

HELLO. We have a project that will be applying for LEED certification under CI for Retail. This project is supermarket within a mall, the retail space is rented.

1
Tue Apr 30, 2013, 2:00 pm

Showing Prescriptive Compliance for CRAC units

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Christie Rimes  on 

The CI project I am working on uses a CRAC unit and I was uncertain, which category CRAC units come under. If it is classified as Packaged Unitary Equipment then it needs to show compliance with E

1
Mon Nov 2, 2015, 2:15 pm

LEED Retail CI EAc1.3 zoning and controls

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Francisco Aguirre  on 

Hi, I am working on a retail project with a VAV system where zoning is performed by variable dampers controlled by thermal sensors in each different thermal zone.

1
Mon Jul 11, 2016, 5:07 pm
1
Wed Sep 8, 2010, 3:27 pm

3 questions

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mark Taake  on 

Our project involves multiple renovations of areas within a large hospital. We are applying under CI rather than Healthcare because the project is not a total gut.

1
Mon Jan 21, 2013, 5:46 pm

Complete information on Variable Speed Control

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mike D  on 

There are no pumps or VAV fans on this project which are 5hp or greater.

1
Thu Jun 27, 2013, 12:01 am

LEED CI - HVAC Syatem selection and Fan power Modeling

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  SAMY Chamy  on 

Dear All:- How to select the Baseline HVAC system for LEED CI Project and how I calculate the fan power for fan interlocked with HVAC system Can we us the 7Group fan power calculator for baseline

1
Wed Aug 24, 2016, 2:55 pm
1
Mon Nov 8, 2010, 3:34 pm

Percent Annual HVAC Energy Cost Reduction

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Which Cost reduction equation should be used on template when cooling plant has been updated with a high efficiency chiller and therefore proposed has been modeled including all the areas that th

0

Project Scope and Tenant Scope

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Leandro Silva  on 

Another one I can´t quite get my head around. Our client will be the sole tenant in a small commercial building.

1
Fri Apr 11, 2014, 5:16 pm