How to interpret "Huddle Rooms"?

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Brian Salazar  on 

Hello - We are in the process of certifying an interior fit-up which utilizes a number of small "huddle rooms" which are enclosed spaces roughly the size of a private office, but furnished with occ

4
Senior Project Engineer
Whitman, Requardt & Associates, LLP
LEEDuser Basic Member
6 thumbs up
Sat Jul 26, 2014, 12:39 pm

Energy Modeling

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Charles Nepps  on 

We received a review comment back, on Energy Modeling report use to document EA cr1.3, that stated the following: "The Proposed design air cooled chiller COP for office is indicated 2.5 does not c

5
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Fri May 23, 2014, 5:12 pm

Tenant space fan & pump sizing

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mike D  on 

We are a bit confused as to the meaning of space fan and pump sizing? Could anyone please offer some clarification? Thanks!

9
Default Avatar
LEEDuser Basic Member
45 thumbs up
Fri Mar 14, 2014, 3:16 pm

One RTU not qualifying the prescriptive requirements

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Sunayana Jain  on 

Hi, I am working on a LEED CI project in which HVAC equipments (serving tenant space) are not being replaced ( 5 RTU units), one of the RTU unit is very old and does not qualify Efficiency requirem

6
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Feb 17, 2014, 6:54 pm

Constant Volume RTUs and Energy Star Label

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Sunayana Jain  on 

I am not clear from CPG whether VAV is required for Option1 (Equipment Efficiency - 5 points). I have Constant Volume RTUs serving the tenant space. All of them have supply fan less than 5 HP.

2
Mon Feb 17, 2014, 5:13 pm

"relevant criteria"

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Marco Abdallah  on 

The project can comply with the requirements of the credit if the project team can show that the relevant criteria have been met for all HVAC systems serving the area within the project scope, whet

5
Thu Jan 23, 2014, 3:39 pm

Points for High-Efficiency HVAC Motor

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Emily LaChapelle  on 

How and in what way can points be obtained specifically related to a high-effiency HVAC motor in a retro-fit scenario?

3
Thu Sep 19, 2013, 8:40 pm

Damper actuator for operating HVAC systems

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Katherine Ann Resurreccion  on 

Hi, does a damper actuator qualify as an active control? Per CIR#10242, "Active control is the control capable of sensing space occupancy and adjusting the HVAC system demand based on the changes

4
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Wed Sep 4, 2013, 6:03 am

Option 1, Equipment Efficiency - Reuse of Existing Equipment

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Tony Ricketts  on 

Hi all, I have a tenant fit-out project served by water source HPs.

3
Default Avatar
Mechanical Engineer
CJL Engineering
LEEDuser Basic Member
22 thumbs up
Fri Aug 16, 2013, 5:39 pm

Insulation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Catalina Caballero  on 

Our project consist in a conversion from a warehouse to a university. but only part of the univeristy is being certified.

4
Fri Aug 16, 2013, 12:51 pm