Forum quick links
Building Over Hang
CI-2009 EAp2:Minimum energy performanceposted by Simon Sue on
We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.
No Design Engineer
CI-2009 EAp2:Minimum energy performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on
Currently working on a project in which all HVAC mechanical systems were existing. Only the ductwork was installed.
Lighting load synergy in EAp2 and EAc1.2
CI-2009 EAp2:Minimum energy performanceposted by Saju Varghese on
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?
Section 11 or Appendix G?
CI-2009 EAp2:Minimum energy performanceposted by Steve Gross on
Does this credit require the use of Section 11, or can Appendix G be used? I previously asked this about EAc1.3, but this credit does state section 11 in the language.
Brazilian equivalent standard
CI-2009 EAp2:Minimum energy performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
Interactive Compliance Forms.
CI-2009 EAp2:Minimum energy performanceposted by elizabeth warlop on
If I am not altering the HVAC, Or Building Envelope, or Service Water, Do I have to fill out the Interactive Compliance Forms, ie the Building Envelope, the HVAC Compliance the Service Hot water.?
ASHRAE 90.1 2007 Section 9.4.1 Automatic Lighting Shutoff
CI-2009 EAp2:Minimum energy performanceposted by Ashonta Langdon on
Hello! We're working on a TI office project of less than 5,000 sf in a building that is larger than 5,000 sf.
Owner installed lighitng
CI-2009 EAp2:Minimum energy performanceposted by Allen Cornett on
I am trying to find out if a building owner is installing new lighting in a space, will a future tenant be able to included the existing lighting in the lighting power density calculations for EAp2