Forum quick links
Small Lab in Office w/ Multiple Controls
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Haley Duncan on
Hi, My project is a winery with a 300 square foot lab. There are three workstations, but only two employees work there most of the time.
Control Lightning
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Ramon Gomez on
We are currently working in a facility that that has a system called "Softswitch" from the Lutron Electronics Co.
Illustrating Compliance using representative sampling?
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Ryan Hoffman on
All, We are working with a client in a 1.2 mill. SF office building with three towers connected by a central core.
Lighting Controls in Multi-occupant Spaces
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Geoffrey Tomlinson on
I'm confused about the credit requirements.
Clarification for Conference Room
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Alexa Stone on
Hi All, For a convention center building where over 90% of the building consists of "multi-occupant spaces" i.e.
Environmental Labs in Office Building
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Victoria Bauer on
Hi, I am working on a LEED project in an office building that has environmental labs. Some of the labs have workstations to input data, but not a permanent desk for an occupant.
HIGHER EDU. PROJECT
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Benoit Gosselin on
We are currently working in a higher education campus where there are several space types such as pools, cafeterias, stores, laboratories, studios, residences, workshops, lounges and a radio studio