Exhaust system tests
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Agnieszka Rylska on
I have two questions regarding exhaust system tests: 1. Do the tests have to be conducted only for local exhaust fans (like e.g.
Public Corridors Lack Ventilation
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ali Stricks on
I’m dealing with a building that generally meets ASHRAE 62.1, however several public corridors are unconditioned and unventilated.
Case 1 - Grouping the space types
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by satheesh M on
Hi, we are working for the project with multiple tenants. we could not collect all the floors HVAC layouts. but we have the AHU details.
Guidance for IDEC Systems?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dustin Campbell on
Does anyone have experience applying the “USGBC LEED 62MZCalc” spreadsheet for Indirect Evaporative Cooling (IDEC) systems? Or, is there an alternate compliance path elected due to the significant
VRF with DOAS inyecting air into common return plenum
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Zonda E. Team on
Hi there, I'm working on a project with VRF + DOAS, where outside air is injected into a common return plenum for all VRF indoor units.
IEQp1 and Performance Period Timeline
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Jennifer Turchin on
I am working on a number of facilities owned by the same entity and they want to have the outdoor air testing done at all the facilities as one scope of work for a contractor, however, the performa
Measuring for an Office Building with 92 Heat Pumps
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alan Grant on
My client has an office building with one outside air supply fan supplying ventilation air throughout the three story building via ductwork to 92 heat pump units.
Exhaust Fan Testing in a Laboratory
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alexis Thompson on
I am working on a laboratory project and we are gearing up to perform the exhaust fan testing internally.
Natural Ventilation in a Warehouse
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Diego Pietzsch on
How can a large Warehouse that uses natural ventilation system, but does not meet the requirements of ASHRAE 62.1-2007 section 5.1 be able to pass under the LEED EBOM IEQp1?
Having problems with IEQp1
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ryan Gardner on
Our building is nearly 100% naturally ventilated. Every office space has more than enough window area to be compliant.