Forum quick links
Parking exhaust
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Emmanuel Pauwels on
Do parking spaces or restrooms need to comply with Ashare exhaust rates of table 'TABLE 6-4 Minimum Exhaust Rates'?
EBOM IEQp1: Dedicated OA to classroom FCU's
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
For EBOM IEQp1 we have a school using a dedicated ventilation AHU providing ventilation air to classroom FCU's.
Fresh air requirements for a supermarket
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Zachary Goodnough on
I was wondering if anyone has experience dealing with supermarket fresh air calculations. In particular, is a supermarket's storage area considered an occupiable space?
Occupancy for the calculations
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patricia Fuertes on
Good afternoon, I have a question about the occupancy I have to take into account for the minimum air flow calculations.
Occupancy Doubt
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi everyone, i'm working in a office building that will be certified.
Ashrae 62.1 vetilation rate - Constant OA with VAV system
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Bradford Crosby on
We have a constant volume air fan feeding many floors. It feeds the mechanical space using it as a plenum. At the floor level there is a Supply fan serving the VAV and Fan boxes.
Using the calculator (continued)
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Christina Reeves on
Hello again, We now have the 62MZ spreadsheet working (thanks again!), but a few more questions have come up as our ME works through it. Can anyone provide some insight on these? 1.
Option B Calculator
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Haley Duncan on
Where can I find the Option B Calculator that is used to calculate compliance with 10 CFM per person for AHU's unable to meet ASHRAE 62.1-2007?
Vacant Space Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Robert Calloway on
I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.