Forum quick links
Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by bryan lauer on
For Miami-Dade County, FL.
In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)? In the building
online form SI units not functioning correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by GEORGE GKLAVAS on
When using the same input data in both forms (IP and SI units) someone should expect the same result (percentage mitigated).
Online form not functioning correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Mihir Parikh on
I am having the same problem with the online form and pdf for ssc6. Has anyone figured this out?
Showing a reduction?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by American University on
I'm unclear as to how we show a reduction in stormwater runoff. I see how we calculate the current runoff by figuring the area type and using the formula given, but what does that get compared to?
inspections
EBOM-2009 SSc6:Stormwater Quantity Controlposted by cathy keagle on
Are there any requirements on who must perform the Stormwater system inspection for LEED
Equation 3 Help
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Sam Watters on
I see that equation 3 in the reference manual performs the calculation for Q, the peak runoff rate, but I do not see how this value is used to calculate the amount of water retained on site. How d
previous documents
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Brian Dougherty on
I am working to get the EBOM SSc6 v2009 credit. The building has already received the credit for NC v2.2 SSc6.1 and SSc6.2. I have the documentation for the previous version and credits. 1.
Equation 1 Interpretation
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Austin Evans on
In the Volume Captured equation the variable "I" is said to stand for percent impervious of surface. Is this the same thing as the coefficients or is this different?