Forum quick links
Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by bryan lauer on
For Miami-Dade County, FL.
In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)? In the building
online form SI units not functioning correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by GEORGE GKLAVAS on
When using the same input data in both forms (IP and SI units) someone should expect the same result (percentage mitigated).
Online form not functioning correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Mihir Parikh on
I am having the same problem with the online form and pdf for ssc6. Has anyone figured this out?
Unsure if LEED form is behaving correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Johanna Ofner on
My project is pursuing Option 1, stormwater assessment report, of the Full documentation option of the O&M submittal path (what a mouthful!) of SSc6.
Gravel Coeffecients
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Steve Walker on
I have 3 parking lots which are comprised of gravel (chat)....what would the coefficient for this be? I believe it should be less than any kind of pavement but more than grass.
Doubt
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Hugo Pereira on
Hello there. My team and I are certifying a building in Brazilia, Brazil.
Fish as biological control
EBOM-2009 SSc6:Stormwater Quantity Controlposted by SIG - Sustainability Main Account on
Off site water storage
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Prudence Ferreira on
Our project site is a winery that directs stormwater to ponds which are later used for irrigation. The only thing is that the ponds are sometimes considerably distant from the LEED building.