Three questions (Sorry about that last inadvertent post!):
1-The corporate campus on which my building sits has an NPDES demonstrating that the infiltration is =/> that of the pre-development site. Can we use this to qualify for SSC6 or do we still need to do the stormwater calcs?
2-The building is just one of a multi-building campus that shares impervious and pervious spaces, so whether we can use the NPDES or whether we need to do our own stormwater calcs according to the LEED SSC6 form, we will need to submit for the whole campus -- even though we're seeking certification of just one building. Is this acceptable or would this approach require a CIR?
3-How exactly can I use the Licensed Professional Exemption in this particular case? I have a stormwater specialist who is a P.E. What's the benefit of this exemption and what's required of him - besides his completing the LPE form?
Thanks much!!